All checks were successful
Build and deploy / Validate source (push) Successful in 10s
Build and deploy / Integration suite on a real stack (push) Successful in 4m5s
Build and deploy / Secret scan and release gate (push) Successful in 10s
Build and deploy / Publish images (push) Successful in 1m33s
Dropstar's internal rules of 2026-10-26: the coordination pulls back, never forward, always with a reason. The Gestão profile now sends orders to Correção from any stage and steps them back, and no longer moves them forward. Admin, Dropstar's own login, keeps every move but Finalizado, which stays the Revisor's (D-29). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Documents
| File | What it is |
|---|---|
reuniao-2026-09-09-anotacoes.pdf |
Meeting notes that set the business direction: the bottleneck, the 24h goal, the automation and payment decisions. Still the record of what was asked for. |
roadmap-cliente.pdf |
The client-facing plan, as last sent. Generated by tools/generate_dtf_report.py; regenerate rather than edit. |
historico/ |
The original specification and prototype documents. Background only — they describe a model this system does not implement. |
Current engineering documents live at the repository root: CONTEXT.md for how
the system works, ROADMAP.md for what is outstanding, LOCAL_SETUP.md to run
it, PORTAINER.md to deploy it, SECURITY_REPORT.md and PRODUCTION_INPUTS.md
for the security position and the decisions still owed by the client.
Weekly client reports are deliverables, not repository content. They are produced for a specific week and are deliberately not versioned here.