Files
dtf-system/docs
Cauê Faleiros 629628a522
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m26s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 59s
docs: the project's state on 2026-10-26: what Dropstar settled and what is left
The "waiting on Dropstar" list still named work that is done. It now says
what Dropstar settled on 23/10, and what is left: the single price per
product, the DTF number in Tiny's numeroPedidoEcommerce, and what waits on
them (the category id, the flow image, the rules document, the montador spec,
a written decision on the three server folders).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 10:03:47 -03:00
..

Documents

File What it is
reuniao-2026-09-09-anotacoes.pdf Meeting notes that set the business direction: the bottleneck, the 24h goal, the automation and payment decisions. Still the record of what was asked for.
roadmap-cliente.pdf The client-facing plan, as last sent. Generated by tools/generate_dtf_report.py; regenerate rather than edit.
historico/ The original specification and prototype documents. Background only — they describe a model this system does not implement.

Current engineering documents live at the repository root: CONTEXT.md for how the system works, ROADMAP.md for what is outstanding, LOCAL_SETUP.md to run it, PORTAINER.md to deploy it, SECURITY_REPORT.md and PRODUCTION_INPUTS.md for the security position and the decisions still owed by the client.

Weekly client reports are deliverables, not repository content. They are produced for a specific week and are deliberately not versioned here.