All checks were successful
Build and deploy / Validate source (push) Successful in 10s
Build and deploy / Integration suite on a real stack (push) Successful in 3m27s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m2s
Gestao opens a rework from the order panel with its cause (falha de impressao, perfil de cor, erro de tratamento, erro de pedido, or arte aprovada pelo cliente, outside the goal), the metres redone and a note; the cause never changes. An Administrador authorizes or declines it with a reason, never one they opened, and only an authorized rework counts. The order keeps who printed it. Numeros shows the metres redone per cause over the film printed, against 0,4% per cause and 1,6% for the house, by who printed, and the reworks waiting for authorization. Vendedor goes back to viewing only (D-30): registering orders paid outside is Administrador and Gestao. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Documents
| File | What it is |
|---|---|
reuniao-2026-09-09-anotacoes.pdf |
Meeting notes that set the business direction: the bottleneck, the 24h goal, the automation and payment decisions. Still the record of what was asked for. |
roadmap-cliente.pdf |
The client-facing plan, as last sent. Generated by tools/generate_dtf_report.py; regenerate rather than edit. |
historico/ |
The original specification and prototype documents. Background only — they describe a model this system does not implement. |
Current engineering documents live at the repository root: CONTEXT.md for how
the system works, ROADMAP.md for what is outstanding, LOCAL_SETUP.md to run
it, PORTAINER.md to deploy it, SECURITY_REPORT.md and PRODUCTION_INPUTS.md
for the security position and the decisions still owed by the client.
Weekly client reports are deliverables, not repository content. They are produced for a specific week and are deliberately not versioned here.