Commit Graph

321 Commits

Author SHA1 Message Date
Cauê Faleiros
a712c69aca fix: align proof, treatment, metrics and site videos with PDF
All checks were successful
Build and deploy / Validate source (push) Successful in 11s
Build and deploy / Integration suite on a real stack (push) Successful in 5m44s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m22s
2026-11-06 15:27:48 -03:00
Cauê Faleiros
f4cd1842ca fix: Atrasados lists production stages and real orders only (front 11)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 4m27s
Build and deploy / Publish images (push) Successful in 1m6s
A delivery is done when it leaves and a test card is not production. Only
pickup orders waiting in Finalizado can be late, and the top strip now
shows working columns; the finished pickup keeps its card colour and its
place in Números.
2026-11-06 13:15:30 -03:00
Cauê Faleiros
c8d03d3b94 feat: designer treatment as an optional paid line (front 5)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 4m20s
Build and deploy / Publish images (push) Successful in 1m5s
TREATMENT_CENTS sets a fixed price per order; 0 keeps the option hidden.
The cart shows the designer treatment and adds 24 h; the quote total and
Tiny line carry it, and the card gets the "Tratamento pago" label. The
designer uploads the treated file through the existing card flow.
2026-11-06 13:07:22 -03:00
Cauê Faleiros
bdff73b76b feat: acceptable time per stage with late cards and alerts (front 11)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 4m24s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m0s
Gestão edits the hours and the responsible for each column. A card past the
limit turns yellow, twice the limit red, and the board lists it under
Atrasados. Números compares the real median with the limit and counts the
passages that exceeded it in the period and today.
2026-11-06 12:52:53 -03:00
Cauê Faleiros
7e22262280 feat: the Site has a videos area and a floating product video (front 4)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 4m18s
Build and deploy / Publish images (push) Successful in 1m5s
The home lists the six DTF videos with their titles and state; a card opens
a modal player. A product page gets a muted, captioned 30 s floating video
when its file is configured. The files themselves are still to be recorded;
until then the cards say "Em produção".
2026-11-06 12:44:33 -03:00
Cauê Faleiros
b10eeead6e feat: Prumo tells the card and the customer what it did (front 6)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 4m41s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m6s
Every order now carries a short report of the decisions that happened:
original format, conversion, resolution, background, residue, montage,
billed length, contraction, thin-stroke warning, parts and generation time.
The card shows it above the file; the payment summary shows the customer's
version. The upload keeps the original name so a renamed CDR/PDF is told.
2026-11-06 12:37:08 -03:00
Cauê Faleiros
25e4ac541a feat: the customer sees how long each site step is taking (0.12)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 4m26s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m0s
The file card, the sheet preview and the analysis status now count the
seconds since the file arrived; the confirmation says the Prumo is
preparing the print file and the usual estimate per 10 m.
2026-11-06 12:18:02 -03:00
Cauê Faleiros
dc87d46801 fix: Prova OK gives the parent its Prumo final and queues it (0.1)
The proof answer is the parent's check: every ready full print file Prumo
generated becomes an active final, and the parent enters Arte conferida.
Items that still need hand preparation stay in Arte recebida.
2026-11-06 12:17:57 -03:00
Cauê Faleiros
c291f00e96 docs: note where the pricing parity test runs
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 6m44s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m36s
2026-11-06 11:41:15 -03:00
Cauê Faleiros
b97b895993 docs: the phase-2 roadmap records the completed stage 0 2026-11-06 11:39:55 -03:00
Cauê Faleiros
f78cb93ba7 test: the browser walkthrough follows the new final, residue and machine rules
The final file is a 300 DPI PNG; a ready sheet offers the residue
acceptance; an oversized PNG is refused; and the pull chooses the machine.
2026-11-06 11:39:23 -03:00
Cauê Faleiros
3d1293a3af test: a unique CNPJ in the search and the reset output (0.11) 2026-11-06 11:19:41 -03:00
Cauê Faleiros
2bcdb060fd feat: the launch reset keeps the order numbering and clears the folders (0.11)
The existing launch_reset now also empties the Kanban flow folders, keeps
Estampas/, and no longer restarts orders.number: DTF-1…DTF-15 already exist
in Tiny. It still refuses real money, counts first and needs APAGAR.
2026-11-06 11:11:36 -03:00
Cauê Faleiros
6351a094f4 feat: Números measures the site and the Prumo (0.12)
The browser records page load, upload speed and bytes, Prumo's check and
the loose-art montage; the quote keeps them and Números shows average and
p95 per period. Print generation and the payment-to-card time come from
the database. The upload bar already estimates its remaining time.
2026-11-06 11:09:36 -03:00
Cauê Faleiros
945c9e366a feat: the phase-2 reset script and the proof-order contact rule (0.11)
reset_board deletes orders, quotes, cards, uploads and their history, and
empties the Kanban flow folders while keeping Estampas and every setup
record. It is a dry run unless --yes is passed, and never resets the order
numbering. A proof order closes contact with Prova OK; orders without a
proof keep their "Contato feito" action.
2026-11-06 11:04:11 -03:00
Cauê Faleiros
054a642a61 test: the suite follows pull-only machines, the proof lock and 200 DPI
The old tests created orders with an automatic machine and moved them
without one. They now choose a machine or pass it to the pull, expect the
proof lock before any move, and use the 200 DPI clean grade.
2026-11-06 11:02:43 -03:00
Cauê Faleiros
392e7da85b fix: the proof crops the finest stroke and closes the contact wait (0.1)
The browser records where the thinnest stroke sits in the assembled film;
the proof takes a 15 cm window around it instead of always the top. A free
proof no longer fails the layout's billed-metres check, and answering the
proof card clears "Aguardando contato" and ends its timer.
2026-11-06 11:02:39 -03:00
Cauê Faleiros
d69e326125 feat: the proof card, machine pull and print file corrections (Dropstar, 05/11)
The proof card owns its final PNG, keeps its parent locked until the seller
answers, enters the queue first, and shares one machine with the parent.
The board no longer assigns a machine at payment; the puller records it.
A stalled print file times out with a card warning and a retry, finished
orders sort by completion, and finals are stored as PNG. The original
download carries the order number (items 0.1, 0.4 to 0.7 and 0.9).
2026-11-06 10:41:20 -03:00
Cauê Faleiros
0fc01315c7 feat: the site's third-round corrections on acceptance, DPI and the final file
Residue and thin strokes can be accepted on ready sheets and loose art,
with the consent and its time kept on the order. The resolution rule is
96/200 DPI, and a final file must be a transparent 300 DPI PNG. The art
score leaves the customer's cart and buy box (Dropstar, 2026-11-05).
2026-11-06 10:41:14 -03:00
Cauê Faleiros
94f1bfa733 fix: retention test reaches its file; items without a layout go to hand preparation
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 4m38s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m11s
The cleanup purges 50 expired files a pass, oldest first, and the suites
before the retention test now leave more than that: the test runs it until
its own fixture is reached. A print job for an item without a layout (an
order written straight to the database) is hand preparation, not a crash on
the footer.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 20:57:42 -03:00
Cauê Faleiros
5520081184 feat: the proof card, a child order the seller answers (Dropstar, 30/10 and 03/11)
Some checks failed
Build and deploy / Validate source (push) Successful in 1m8s
Build and deploy / Integration suite on a real stack (push) Failing after 3m14s
Build and deploy / Publish images (push) Has been skipped
Build and deploy / Secret scan and release gate (push) Successful in 9s
An order with a proof (asked for at checkout, or above 10 m) gets a child
card "Prova": an order of its own (orders.parent_id), no sale, with the
film's first 30 cm as DTF-N-item-1-prova.png ("Prova do pedido DTF-N" in its
footer), which follows the flow up to Revisão like any card, hot folder
included. The order waits outside the queue, "Aguardando prova": it is not
pulled to Imprimindo, nor counted in the queue's places.

In Revisão the card is answered by the Vendedor, Gestão or the
Administrador (capability "proof"): Prova OK records who and when and puts
the order in Arte conferida when its finals are approved; Prova reprovada,
with its reason, sends the order back to Arte recebida, its final to be
approved again, and offers "Nova prova". Either way the card closes and
leaves the board. An order from before the cards keeps the old Prova OK.

The card is kept out of Tiny, e-mails, Números, the search, Finalizado and
the customer's account. Deleting an order takes its cards and their rows:
movements, order files and print files now cascade with their order.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 20:39:52 -03:00
Cauê Faleiros
8b7d9f0bdb feat: "Abrir e conferir", the print file full screen, in pieces (item 7)
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 4m28s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m17s
The card's "Abrir e conferir" opens the order's print file full screen
(Dropstar's third round, item 7): zoom up to 100% real (one file pixel, one
screen pixel), the position in cm, the order's files one after the other
without closing, and the background behind the transparency light, dark or
checkered, remembered (Dropstar, 2026-10-30). Closed in Arte recebida, it asks
"Está OK?": the class of each item, prefilled with the measure, then
"Mover para Arte conferida" (the final approved, the class kept, the card
moved) or "Tratar a arte".

A 15 m film is loaded like a map: while the PNG is written, its strips of
512 rows go to storage at 100% and at each halving (app/printtiles.py,
originals/tiles/<upload>/), and the viewer (web/kanban-viewer.js) fetches
only those on screen. They go when their file expires. Storing a print file
that fails is now an attempt like a failed render, not a claim held for an
hour.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 20:10:03 -03:00
Cauê Faleiros
e3a5ad6fa0 feat: printing files go into each machine's hot folder, part by part (item 10)
All checks were successful
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m13s
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m56s
Pulled to Imprimindo, an order's files go as a copy into
3. Imprimindo/<máquina>/<C1|C2|C3>/, the class of each item (chosen in the
Kanban, or measured by the Site), where FlexiPRINT takes them (Dropstar's
third round, item 10). A film in parts goes to the same machine, in order,
never more than two parts in its folder: the next is written when Flexi
takes one. The card says "Parte 3/7 imprimindo · 4/7 ripando".

The server decides what each folder gets (app/hotfolder.py,
dtf_local.hot_parts) and the Kanban's computers write it: each part is
claimed by one computer, so Flexi never gets it twice; a claim that did not
finish goes back to the queue; a part gone from its folder was taken and is
never written again; a card that leaves Imprimindo or is cancelled has what
Flexi did not take deleted. A part without a class waits for one, and the
class may still change in Imprimindo until its file is written.

The folder sync also follows files one by one, so the parts of a film over
15 m are no longer taken for replaced copies of each other.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 17:05:08 -03:00
Cauê Faleiros
353935bed3 feat: the print file is a 300 DPI PNG, in parts of up to 15 m (item 13)
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 4m55s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m27s
FlexiPRINT's Spot OK 1 makes the white from transparency and reads it
reliably only from a PNG (Dropstar's third round, item 13): each order item
is now DTF-N-item-I.png, 300 DPI, RGBA on a transparent background, with its
footer; a film over 15 m leaves as DTF-N-item-I-pK.png parts, each with
"Parte K/N" in its footer, cut between pieces of loose art when it can be.

app/printpng.py never holds a whole sheet: the film is composed and written
in bands. Pillow encodes each band (it picks the PNG filters) and one zlib
stream takes them; a long PNG sheet is read band by band by wrapping its
compressed rows as small PNGs; a PDF page is drawn band by band at 300 DPI by
PDFium (pypdfium2, a self-contained wheel); loose art is turned and scaled
once. A 57 x 220 cm sheet peaks at 191 MB, a 15 m film at 279 MB.

The parts of an item are dtf_local.print_parts (print_files.upload_id stays
the first); the board, the final approval, the folders and the cleanup see
every part, and the Kanban approves and downloads them all. A large PNG or
PDF is now generated like any other; only other large formats go to hand
preparation, and the original no longer stands in as the print file.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 16:53:35 -03:00
Cauê Faleiros
bd1e1772a7 feat: Dropstar's 03/11 answers on residue and item 16; wide areas count in the stroke
All checks were successful
Build and deploy / Validate source (push) Successful in 11s
Build and deploy / Integration suite on a real stack (push) Successful in 5m25s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m20s
- Residue: the acceptance stays on loose artwork only ("arquivo
  fracionado"), with their text. A ready sheet with residue goes back,
  as the designer cannot clean a closed sheet.
- Item 16, new rule, all three at once: thinnest stroke up to 4 px, at
  least 60% of the ink in areas 20 px or wider, at most 10% of the ink in
  strokes up to 4 px. One pop-up per file, on ready sheets and loose art,
  that does not block: "Imprimir assim mesmo (C1)" (default) or "Quero
  subir em dois arquivos". The ready sheet's three options are gone; the
  card notes that the customer was warned and printed as C1.
- The stroke reader counts the ink in wide areas with their edges and the
  ink in strokes up to 4 px, and areas wider than the measured distance now
  add axis samples: two edge pixels no longer make a solid art C1 ("Salmo
  91" was C1 at 3 px, now C3). The four test sheets still give 2, 5, 20
  and 4 px; the new rule triggers on 4 of the 9 real arts.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 14:56:35 -03:00
Cauê Faleiros
a17f5fc08d fix: only the designer side approves files; specks are not strokes
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m52s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m14s
- "The designer approves every file" (Dropstar's rule D-16): the Operador
  leaves "produce", so it no longer approves final files, picks the
  contraction, treats the art or marks the contact wait. It pulls and
  prints. The order panel says the Designer approves and shows the
  contraction read-only; the profiles table follows.
- The stroke measure drops ink components under 30 px (at 300 DPI) before
  the distance, as Dropstar's method says (2026-10-30). Each strip keeps
  at least 30 rows of context, so a speck is always seen whole and a
  component cut by the strip is a stroke. One real order sheet went from
  C1 (2 px, specks) to C2 (5 px); Dropstar's four test sheets still give
  2, 5, 20 and 4 px. The artwork browser test checks widths 2, 5 and 6,
  and a C3 sheet with 300 specks.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 11:10:23 -03:00
Cauê Faleiros
67fad3a2d7 fix: the profiles table says Financeiro only looks at Pagamentos
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 4m0s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m5s
Resolving a payment needs Gestão or Administrador (Dropstar, 2026-10-30:
Financeiro "vê Pagamentos"), and the table showed it as something Financeiro
does. It also lists registering an order paid outside the site, which
Administrador and Gestão do (D-35).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 10:37:35 -03:00
Cauê Faleiros
2615163fd3 feat: stroke class, residue per artwork, mixed strokes, sheets split by class
All checks were successful
Build and deploy / Validate source (push) Successful in 1m25s
Build and deploy / Integration suite on a real stack (push) Successful in 4m40s
Build and deploy / Secret scan and release gate (push) Successful in 12s
Build and deploy / Publish images (push) Successful in 1m38s
Round 3, items 9, 4, 16 and 17 (Dropstar, 2026-10-30).

- 9: the Site measures the thinnest stroke of each sheet and loose artwork
  (alpha > 40, chamfer distance in strips, width at local maxima, 1st
  percentile, at 300 DPI) and sends stroke_px and C1/C2/C3 with the item.
  The Kanban shows the class prefilled in the approve step; Produção may
  change it (POST /orders/{id}/contraction, who and when recorded), and the
  manifest carries it.
- 4: the residue check runs on each loose artwork, accepted per artwork; the
  sheet inherits what was accepted.
- 16: fine lines and solid areas in one file. Loose art: a pop-up with
  [Subir separado] [Continuar assim]. Ready sheet: protect the fine lines
  (default), protect the solid areas (stroke_choice client_c3, starts at C3)
  or go back and send two sheets, which holds the order.
- 17: loose art of fine (C1, C2) and solid (C3) strokes goes on separate
  sheets, each its own order item (split group/part/of) with its own file
  and class. Each sheet rounds to 10 cm and the 1 m minimum is charged once
  per group, since the customer did not choose the split. Cart, payment
  summary, portal, receipt and mail show it as such.
- The board loads quote views in two queries instead of two per quote.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 10:24:29 -03:00
Cauê Faleiros
388408d4d6 feat: drop a card on the machine it prints on; Pagamentos says who paid
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m38s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 57s
- Imprimindo: every active machine has its lane, and a card dragged
  from the queue onto a lane goes to that machine (if it prints the
  product and has a place), instead of the one it came with. The
  operator's pull still goes to the machine they are on (item 12).
- Pagamentos: each payment shows who tried to pay and what they were
  buying (the quote's customer and items, and its order if there is
  one); a click opens the customer's name, e-mail, CPF/CNPJ, WhatsApp
  and delivery, the quote, and Mercado Pago's id and status.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 17:23:35 -03:00
Cauê Faleiros
a010b2507e fix: a stalled card says it only in red at its time, not as a mark too
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m41s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m1s
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 17:03:23 -03:00
Cauê Faleiros
df601a7b6e fix: Números' rework meters are thin bars again
All checks were successful
Build and deploy / Integration suite on a real stack (push) Successful in 3m30s
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m11s
The panel filler and the meter's bar were both called .fill, so every bar
took the filler's 460 px; the filler is .fillbox now.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 16:53:25 -03:00
Cauê Faleiros
67a9cd9533 fix: the item preview's tab says Montagem, so it fits beside Arte
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m25s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 53s
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 16:17:35 -03:00
Cauê Faleiros
0b8eb143ad feat: the Kanban on the phone follows the phone mockup
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m40s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 56s
- Top bar with the logo, search and filters; at the bottom Produção,
  Cotações, Pagamentos, Números and "Mais" (Integrações, Usuários, the
  machine, the theme, the password, Sair) in a sheet.
- Produção: the stages as chips, the stage's metres and the session's
  machine over the cards, the queue's download as a button, the
  filters (product included) in a sheet.
- The order as a page: back, the order and its stage, the next step
  with its buttons at the bottom, the facts as rows, WhatsApp, Arquivos
  and Histórico; its actions in a sheet. A quote opens the same way.
- Pagamentos as cards, Números as the mockup's figures, chart and
  lists, Usuários as a list, Integrações as cards, the search as a page,
  dialogs as sheets, and the sign-in with the sheet rolling on top.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 15:00:08 -03:00
Cauê Faleiros
f5c8bcfb90 fix: Kanban panels keep their size; their lists scroll inside
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m35s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m1s
Creating users, machines or orders no longer changes the screen: Pessoas
and the Tiny log have a fixed height, Máquinas shows two and scrolls,
Pagamentos fills the window, Números' machines and treated art scroll in
their panels, and the board fills the window with each column scrolling
under its head. On the phone the pages scroll as before.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 14:42:18 -03:00
Cauê Faleiros
d2e340032e fix: the Kanban's login fits the window, the menus are the mockup's again
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m31s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m8s
- Sign-in: the page is the window's height, never scrolls; the sheet
  rolling under the marks is the design's (docs/design/folha-sapo-flor.svg).
- The account, refresh and order menus had lost their look with the old
  panel's rules; they are popovers again. The account menu leaves the
  theme to the rail's button, right above it.
- Números: panels of a row share their height; rework's lists by
  printer and waiting fold under a line.
- Cotações: the chips of the mockup (Têxtil, UV, Folha, Avulsa, Com
  ressalva), no field of its own; a customer from the top search shows
  as a tag that takes the filter off.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 14:25:53 -03:00
Cauê Faleiros
6f294e168b feat: the Kanban's new screens, from the board to the phone (redesign, steps 2 to 8)
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 4m37s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m10s
- Board: product switch and a filters panel with counts, cards that say
  the next step and the most urgent mark, Imprimindo in one lane per
  machine with its free places, Finalizado as short cards.
- Order panel: the stage and codes on top, "Próximo passo" with its
  button, Pedido / Arquivos / Histórico tabs; going back, contact,
  rework and cancelling in a menu; every form in a dialog.
- Cotações, Pagamentos, Integrações, Números (a calendar for the
  period) and Usuários (who is on the system now, what each profile
  does, the machines) in the design's panels; the sign-in page.
- Phone: sections at the bottom, one stage at a time, the order and
  the dialogs over the whole screen.
- API: each session records when it was last used (at most once a
  minute), for "Ativo agora"; the board says who is on each machine.
- .dockerignore leaves the local test files out of the build.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 13:58:05 -03:00
Cauê Faleiros
c76d2fa7f3 feat: the Kanban's frame, a rail of sections and a new top bar (redesign, step 1)
All checks were successful
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 54s
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m54s
The sections move from tabs in the top bar to a rail on the left, with
an icon each, the counters for Cotações, Pagamentos and Integrações, the
light/dark switch and the account button at the bottom. Its menu holds
"Trocar de máquina", the theme, "Minha senha" and "Sair". The machine of
the session shows in the rail and as a chip in the top bar, both opening
the machine question.

The top bar carries the page's name (Produção also says what is open:
"13 pedidos, 17,40 m em produção"), the search, Tiny only when it needs
attention, and "Atualizado às 09:18": a click there sets how often it
updates by itself, over the same remembered setting, or updates now.
The pages' own headings are gone; on narrow screens the rail lies along
the top until their own layout.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 09:19:45 -03:00
Cauê Faleiros
05139b71ff feat: the Kanban's new base, dark and light (redesign, step 0)
All checks were successful
Build and deploy / Validate source (push) Successful in 1m46s
Build and deploy / Integration suite on a real stack (push) Successful in 4m29s
Build and deploy / Secret scan and release gate (push) Successful in 9s
Build and deploy / Publish images (push) Successful in 1m25s
The design canvas's tokens replace the old palette, with a light theme
beside the dark one: the account menu switches them, and each browser
remembers its choice (web/theme.js, loaded in the head so the page never
flashes the other theme). Every hard-coded colour now goes through a
token, so the screens not redesigned yet read in both themes; their old
variable names map onto the tokens until each is rebuilt. Instrument
Sans and IBM Plex Mono replace Manrope, and the "filme descolando" logo
the D. The look before this is kept in git tag ui-v2.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 08:59:37 -03:00
Cauê Faleiros
ea3b2b29d1 test: drop the last check of the old operator assignment on machines
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m48s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m7s
Who is on a machine now comes from the sessions (item 12); the machine
form no longer carries operators, so "left out, they stay" is gone.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
ui-v2
2026-10-30 13:22:39 -03:00
Cauê Faleiros
db877c52e6 feat: the machine is chosen at sign-in, per session (Dropstar's third round, item 12)
Some checks failed
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Failing after 2m32s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Has been skipped
After signing in, the Kanban asks "Em qual máquina você está?": required
for the operator, optional for Gestão and Administrador ("Não estou em
máquina"), never for the other profiles. The session keeps it until it
ends or is changed from the header, where the machine shows in green;
one person on two computers runs two machines. Someone else already on
the machine is a warning, not a refusal.

Operators see the whole board (no more per-machine filter). From Arte
conferida they pull any card, which becomes their machine's (a machine
that does not print its product refuses it); they move only their
machine's cards, and the others show without drag or buttons. Their
cards and their machine's row in Imprimindo are outlined in green. The
history records the machine with the person: "Imprimindo · Thales ·
máquina2". Usuários shows who is on each machine now, read-only; the old
operator/machine assignment is no longer read.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 13:18:24 -03:00
Cauê Faleiros
8c053596b7 feat: the Financeiro profile (Dropstar, 2026-10-30)
All checks were successful
Build and deploy / Validate source (push) Successful in 14s
Build and deploy / Integration suite on a real stack (push) Successful in 4m44s
Build and deploy / Secret scan and release gate (push) Successful in 9s
Build and deploy / Publish images (push) Successful in 1m12s
Financeiro sees the whole board, Pagamentos, Números and Cotações, and
cancels an order with its reason. It moves no card and touches no file;
resolving a payment stays with Gestão and Administração. Two narrower
capabilities carry it: "payments" (the Pagamentos list) and "cancel",
which used to need "manage". The order panel's menu shows each profile
only what it may do.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 12:56:53 -03:00
Cauê Faleiros
6a312bec9c fix: the account button sits beside the refresh control, without a gap
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 3m57s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m13s
The panel menu's .morewrap rule (margin-left:auto), later in the file,
won over .account's, so the header's free space was split between the
search box and the account button. The account's rule is now specific
enough to win.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 11:33:54 -03:00
Cauê Faleiros
455c1a1fae feat: the order folders numbered in the flow's order, with Revisão and Imprimindo (Dropstar, 2026-10-30)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m50s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m1s
The automatic folders are now 1. Arte recebida, 2. Arte conferida,
3. Imprimindo, 4. Revisão, 5. Finalizado and Recibos, all created when
the main folder is chosen. The file goes to 4. Revisão with the card
(before, it stayed in Arte conferida) and then to 5. Finalizado; 3.
Imprimindo is for the machines' hot folders. Files in the old
3. Finalizado move to 5. Finalizado keeping their 30 days, and the old
folder goes once it is empty.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 10:21:02 -03:00
Cauê Faleiros
c08136d87b feat: the Imprimindo column shows each machine's two places, not a row of counters
All checks were successful
Build and deploy / Validate source (push) Successful in 1m28s
Build and deploy / Integration suite on a real stack (push) Successful in 4m20s
Build and deploy / Secret scan and release gate (push) Successful in 15s
Build and deploy / Publish images (push) Successful in 1m38s
Each machine with something printing is one line: its name, the order
printing (green, as the card's Imprimindo label) and the one ripping
(blue, as Ripando), each opening its order, or a dashed "livre" place;
above the limit, the extra order shows in red. The machines with nothing
printing share one line, "Livres: máquina3 · máquina4", so an empty
column takes one line instead of a grid of "0/2" chips. In a narrow
column the places go under the machine's name.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 10:08:59 -03:00
Cauê Faleiros
d962865944 feat: the pickup receipt in Recibos/ and "Retirado" on the card (Dropstar's third round, item 14)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m38s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 59s
A pickup order reaching Finalizado has its receipt due: a PDF for the
80 mm roll with the order number large at the top, the customer and
CPF/CNPJ, each product and its metres, the amount and how it was paid,
the date issued, and the "Retirado em" and "Assinatura" lines
(app/receipt.py). The Kanban's folder saves it in Recibos/, where the
counter's print queue sends it to the Bematech. One computer claims each
receipt on the server before writing it, so it is never printed twice,
and gives it back if it could not save it. Orders sent by carrier have
none.

"Retirado" on a pickup in Finalizado records when and who handed it
over, with an optional photo of the signed receipt (kept 30 days). Anyone
but the seller may mark it (new "deliver" capability); the order panel
also opens the receipt to print it again.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 18:39:17 -03:00
Cauê Faleiros
a5417d200e feat: a real progress bar per file while it uploads (Dropstar's third round, item 6)
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m42s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 56s
A file starts uploading as soon as it is on the product page, not once
the item is in the cart. Under the uploader, each file has its row:
"Enviando NOME · 62% · 1,2 MB de 2,0 MB", then the security check, then
"enviado"; a failure says why, with "Tentar de novo". Each part goes
through XMLHttpRequest, so the bytes move while a part is on its way
instead of once per 8 MB part. A file taken off the page, and in no cart
item, stops uploading.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 18:18:56 -03:00
Cauê Faleiros
95e7c64501 feat: "Tratar a arte" on an order in Arte recebida (Dropstar's third round, item 8)
All checks were successful
Build and deploy / Integration suite on a real stack (push) Successful in 3m36s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 59s
Build and deploy / Validate source (push) Successful in 5s
The order panel shows where each item's file is in the orders folder,
with Copiar: 1. Arte recebida\DTF-N-item-K, named as the automatic
folders save it (GET /api/operator/orders/{id}/folder-files). The browser
knows only the folder's name, so each computer is told once where it is
and the whole path is copied. "Subir arte tratada" sends the file saved
over; it becomes the item's final, "Arte tratada" lights and the order
can move to Arte conferida.

Only the treated item changes: the others keep their approved final,
which the server now accepts beside a new one (still refused when
nothing is new).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 17:24:15 -03:00
Cauê Faleiros
7f2327aea9 feat: the customer may accept printing a ready sheet's residue dots (Dropstar's third round, item 5)
All checks were successful
Build and deploy / Validate source (push) Successful in 8s
Build and deploy / Integration suite on a real stack (push) Successful in 3m53s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m8s
A sheet with dots under 2 mm still stops the order, now with a box under
the warning: "Esta arte tem N pontos menores que 2 mm. Estou ciente e
aceito imprimir assim — eles podem se perder no recorte." Ticked, the
sheet goes on, and the item carries how many dots were accepted
(residue_accepted), kept through the review and shown on the Kanban card,
order panel and quote. A solid background still stops it, with no box.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 17:10:28 -03:00
Cauê Faleiros
9c44cdf2a1 feat: two cards at most in Imprimindo per machine, one printing and one ripping (Dropstar's third round, item 11)
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 4m14s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m5s
A third pull onto the same machine is refused with "máquina5 já tem 2 em
Imprimindo", and so is changing a printing order to a full machine. On
the board, the first order to enter Imprimindo on its machine is labelled
Imprimindo and the next Ripando; the column shows each machine's count,
as "máquina5 · 2/2".

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 16:19:04 -03:00
Cauê Faleiros
757008566c fix: image builds refresh OS packages once a day, so a cached layer cannot hide a new fix
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 4m6s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m3s
Run 219 was blocked by CVE-2026-111497 in brotli-libs 1.2.0: the fix (1.2.1)
was out, but the cached apk upgrade layer was reused. The build day is now
part of that layer in both images.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 14:57:58 -03:00