Commit Graph

354 Commits

Author SHA1 Message Date
Cauê Faleiros
a6e4d4cb08 Merge front 8.5: configurable art grade rules, off by default
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 6m14s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m5s
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 17:00:36 -03:00
Cauê Faleiros
d85aa10fdd Merge main into front-8
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>

# Conflicts:
#	.gitea/workflows/deploy.yml
2026-11-09 16:47:28 -03:00
Cauê Faleiros
122a72c542 Merge Critical Corrections plan 002: two API processes, worker drains its queue
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 6m11s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 59s
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 16:46:57 -03:00
Cauê Faleiros
c383a4c93b Merge Critical Corrections plan 001: rollback-safe schema and migration files
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 16:46:57 -03:00
Cauê Faleiros
74ac2c978b fix: two API processes by default and the worker drains its queue
The API ran as one uvicorn process, so a slow 150 MB PDF check at checkout
held every other request; WEB_CONCURRENCY now comes from API_WORKERS
(default 2, 1 restores one process) and the api /tmp grows to 512 MiB for
two checks at once. The worker delivered one outbox job per second; it now
drains up to 50 per pass before its periodic tasks.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 16:24:07 -03:00
Cauê Faleiros
272755d2bc feat: the art grade becomes configurable, off by default (front 8.5)
Gestão sets in the Site tab below which grade the designer is warned and
below which the designer treatment is required (only while it is offered).
The decision is stored with the approved quote, so a later change never
rewrites old orders; the card shows 'Nota N: conferir a arte', the Site
forces the treatment box with the reason. With no rule nothing changes.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 16:13:30 -03:00
Cauê Faleiros
6b7ef1c4c8 fix: a rollback never stops the database from starting; schema changes are migration files
schema.sql dropped and re-added three CHECK constraints on every start, so
an older image narrowed the lists and failed on rows written by a newer one
(an Expedição user, for example). They are now created only when missing,
and app/migrate.py applies timestamped files from app/migrations/ once each,
recording them in dtf_local.migrations; an older image skips names it does
not know. The first migration sets today's full lists. A CI step rehearses
the rollback on the real database inside a rolled-back transaction.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 16:11:30 -03:00
Cauê Faleiros
63af984e83 Merge front 7a: the montador in the Kanban
All checks were successful
Build and deploy / Integration suite on a real stack (push) Successful in 6m6s
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m3s
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 16:00:13 -03:00
Cauê Faleiros
89be0a045b test: the montador item's copies sit in one row inside the film
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 16:00:13 -03:00
Cauê Faleiros
f74a6f4fe1 fix: the stamp sizes save again (cursor executemany)
7a.2b brought back the connection-level executemany psycopg does not have.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 15:53:26 -03:00
Cauê Faleiros
31dbd0b062 Merge main into front-7a
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>

# Conflicts:
#	.gitea/workflows/deploy.yml
2026-11-09 15:40:55 -03:00
Cauê Faleiros
3d8be36d65 Merge front 8.3: discount coupons
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 6m28s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m3s
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 15:40:29 -03:00
Cauê Faleiros
2c80de0c0a feat: Montar creates the invoiced order card (front 7a.2b)
The montador sends each stamp to storage, splits the list into items of
at most 20 sources and 4000 copies, packs each one with the Site's engine
and creates the order in Arte recebida: typed customer, pickup, the Site's
table price, payment 'faturado', origin dropflow for Expedição and
atendimento otherwise. Until Dropstar decides, these orders do not go to
Tiny and the customer gets no paid e-mail. Vendedor and Expedição may now
upload through the operator upload routes (can_any).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 15:27:04 -03:00
Cauê Faleiros
60105e7cbe feat: Site videos up to 500 MB
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 6m23s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m6s
Dropstar uploads the six videos themselves; 100 MB was our own limit and
could stop a longer video in the videos area. ClamAV scans up to 2000 MiB,
so 500 MB is still scanned.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 15:26:36 -03:00
Cauê Faleiros
1d0353fe54 feat: discount coupons (front 8.3)
Gestão creates coupons in the Site tab: a code, a percentage or an amount
per billed metre, validity, a minimum of metres, use limits in all and per
customer, one product or all, and a note; they can be paused and deleted
(kept for history). The customer types the code at checkout; the server
checks it when the quote is made and again at approval, discounts only the
eligible items after the bands (never freight or the treatment) and keeps
the coupon on the order. Tiny gets the discount, the e-mail and receipt
show it, the order panel carries a badge and Números counts orders,
metres, discount and money per coupon.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 15:24:44 -03:00
Cauê Faleiros
8993eb25db Merge branch 'main' into front-7a
# Conflicts:
#	app/schema.sql
2026-11-09 15:10:55 -03:00
Cauê Faleiros
07ee38d677 Merge front 8.2 and 8.4: price bands, videos in the Site tab
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 6m17s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m6s
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 15:00:58 -03:00
Cauê Faleiros
2f85a38562 feat: the videos panel in the Site tab, captions optional (front 8.4)
Dropstar uploads the six videos themselves, so the panel moves from
Integrações to the Site tab, next to products and prices. A video can be
published without a VTT: the Site plays it without a captions track.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 14:50:18 -03:00
Cauê Faleiros
2a6732eb37 feat: progressive price bands per product (front 8.2)
A price may carry up to five bands, "from N m, R$ Y": the order's total
billed metres of that product chooses one price for its whole quantity,
the manual-file extra still on top. Bands start and become history with
their price row. The Site charges the same band for the cart, shows
"Faltam X m para R$ Y o metro" and lists the bands under the price
table; the Kanban's Site tab edits them.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 14:30:15 -03:00
Cauê Faleiros
04761e63e3 feat: the Site's packing engine shared with the montador's real layout (front 7a.2a)
The packing engine moves verbatim from web/site-packing.js to
web/packing.js, loaded by the Site and the Kanban. Montar folha packs the
list with it after every change and draws the sheet, showing the real
length instead of the estimate.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 14:25:15 -03:00
Cauê Faleiros
7a5116ab19 Merge main into front-7a
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>

# Conflicts:
#	.gitea/workflows/deploy.yml
#	app/app.py
#	app/schema.sql
#	web/kanban.html
#	web/kanban.js
2026-11-09 14:14:25 -03:00
Cauê Faleiros
c5e7a80b64 Merge front 8.1: products and prices in the Site tab
All checks were successful
Build and deploy / Publish images (push) Successful in 1m6s
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 6m6s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>

# Conflicts:
#	app/schema.sql
2026-11-09 14:10:56 -03:00
Cauê Faleiros
c88d81588e feat: products and prices from the database, edited in the Kanban's Site tab (front 8.1)
Gestão and the administrators switch each product on and off and set its
price from a start date; a price that has started is history and cannot
change, a scheduled one can be cancelled. The Site and the server read
the current price; with no row the code's prices and TREATMENT_CENTS
still apply, so nothing changes until someone sets one. A switched-off
product disappears from the Site and new quotes with it are refused.
Approved quotes and paid orders keep their price.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 13:50:45 -03:00
Cauê Faleiros
e9db9dec06 feat: Expedição profile, stamp sizes and the Montar folha screen (front 7a.1)
The new Expedição profile and the seller may assemble sheets (capability
assemble). Gestão edits the size table (letter and width). The Montar tab
reads Estampas/<code>-<size>.png or <code>.png from the orders folder,
checks the resolution with the Site's 96/200 DPI ruler, merges repeated
lines and estimates the metres. Montar itself is slice 2.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 13:34:43 -03:00
Cauê Faleiros
049f51b56a fix: orders from before the PNG print file are generated again, once
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 6m1s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m0s
An order generated before item 13 had a PDF print file and no strips,
so the 100% viewer opened it blank. Those still in Arte recebida, with
no approved final and no customer correction, are generated again once
as PNG with strips (migration png-regenerate-v1).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 13:25:52 -03:00
Cauê Faleiros
a69b9f71c2 fix: camera, storage images and videos allowed by the page headers
Permissions-Policy forbade the camera, so the review's "Revisar"
(front 2) could never open it. img-src left out the storage host, so
the customer's review photo did not load. And the production CSP had no
media-src at all: the Site videos (front 4), served from storage, would
not play. The camera is allowed for the page itself only; microphone
and geolocation stay off.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 13:25:52 -03:00
Cauê Faleiros
4219db8215 feat: Números per machine, month by month (front 1b)
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 5m58s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m4s
A new Números section, "Máquinas, mês a mês", one column per machine
and a month at a time: metres printed, metres per hour and hours
running (time shared by two orders counted once), hours stopped with
their reasons; metres per film roll, ink per 100 m by colour, powder
per 100 m; supplies, parts and total cost per metre; what the printed
orders sold, the month's contribution and since installation; and the
return in % and months to pay back once Gestão types the price.

Refills stand for consumption. Every ratio without data shows "—".

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 12:50:48 -03:00
Cauê Faleiros
29518795a5 feat: each machine's sheet, counters and alerts (front 1a)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 6m20s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m11s
The machine's name in Imprimindo (and "Ficha" in Usuários › Máquinas)
opens its sheet: metres since the last cleaning and since the last film
change, each supply's estimate, pending alerts and the entries. The room
enters supplies (film, ink by colour, powder; a supply without cost
takes the last one), parts (cap, damper, head, wiper, other) and events
(cleaning, head alignment, a stop with reason and minutes). Gestão types
the price, installation date and supply minimums.

Alerts appear when someone pulls the next card onto the machine, never
mid-print: 10 m since the last cleaning, 20 m after a film change
without aligning the head, and a supply at its minimum. Marked done it
records the event; postponed once it lets one more card through. The
server refuses the pull otherwise. Counters start when the sheet went
live (machines.log_since), not from everything printed before.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 12:19:31 -03:00
Cauê Faleiros
b280e0cfa6 feat: review photo or video in Revisão (front 2)
All checks were successful
Build and deploy / Validate source (push) Successful in 8s
Build and deploy / Integration suite on a real stack (push) Successful in 6m4s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m6s
In Revisão the card gets "Revisar": a photo or a video of up to 30 s of
the printed sheet, from the computer's or the phone's camera in the
browser, or a file already recorded. It is attached to the order as
DTF-<n>-revisao-<seq> with when and who, kept 180 days, and copied by
the computers with the order folders to Kanban/Revisões/. A photo needs
1600 px on its longer side. An order above 1 m cannot reach Finalizado
without one. In Finalizado the customer's order page shows the photo.

The Revisor, Gestão and the administrators take it (capability
"inspect"). Dialogs opened from a card's face or the board (Revisar,
Editar tempos) now show over the page when the order panel is closed;
inside the closed panel they were invisible.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 11:39:15 -03:00
Cauê Faleiros
5aafd9ee91 fix: review of phase-2 stage 0 and fronts 5, 6 and 11
All checks were successful
Build and deploy / Publish images (push) Successful in 1m5s
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 5m7s
Build and deploy / Secret scan and release gate (push) Successful in 6s
- A paid treatment adds its 24 h to Arte recebida's acceptable time, on
  the card and in Números (fronts 5 and 11).
- TINY_PRODUCT_TREATMENT is a required Tiny setting once the treatment
  has a price, instead of every treated order failing at the Tiny.
- A quote reads each PDF once: Files caches the header and the DPI.
- A proof made from the parent's final split into parts uses the part
  that holds the finest stroke, not the last one (0.1).
- Prumo report: one format line per item, the time from the claim (kept
  on the finished print file), and the stroke class in customer words.
- The Site says the Prumo checks the art, and a too-tall PNG no longer
  says "Este PDF".

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 10:45:43 -03:00
Cauê Faleiros
5a51084c8f ci: run the nine test files the phase-2 commits added
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 5m14s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m9s
finished_order_test, machine_pull_test, site_video_test and
treatment_gate_test join the integration suites; test_proof_cut,
test_proof_render, test_prumo, test_speed and test_printpng_validate join
the unit tests. All pass; until now nothing ran them.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 10:09:47 -03:00
Cauê Faleiros
1a9611942d feat: an approved order nobody paid expires in 24 h (front 9)
All checks were successful
Build and deploy / Validate source (push) Successful in 1m15s
Build and deploy / Integration suite on a real stack (push) Successful in 5m10s
Build and deploy / Secret scan and release gate (push) Successful in 11s
Build and deploy / Publish images (push) Successful in 1m29s
An approved quote with no payment expires on its own after 24 h, never
while a Pix or card attempt is still live: the worker marks
quotes.expired_at, frees its files and e-mails the customer that the
order expired and can be sent again on the Site. The backlog from before
this front expires silently.

Kanban: Cotações › Aguardando pagamento shows when each one expires and
the review gets an "Abrir conversa" WhatsApp button; Números gets
"Pedidos sem pagamento" (made, paid, expired, waiting, abandonment rate).

release_files moves to app/payments.py so the worker can use it; an
expired quote no longer counts as open there. New tests/unpaid_test.py
in the integration job.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 10:01:26 -03:00
Cauê Faleiros
448a7fa8c3 fix: a quote's review opens again
The originals list in a quote's review called download(uid, order.id)
after the proof-card change (d69e326), but a quote has no order: every
quote threw "order is not defined" and its review never opened.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 10:01:10 -03:00
Cauê Faleiros
a712c69aca fix: align proof, treatment, metrics and site videos with PDF
All checks were successful
Build and deploy / Validate source (push) Successful in 11s
Build and deploy / Integration suite on a real stack (push) Successful in 5m44s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m22s
2026-11-06 15:27:48 -03:00
Cauê Faleiros
f4cd1842ca fix: Atrasados lists production stages and real orders only (front 11)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 4m27s
Build and deploy / Publish images (push) Successful in 1m6s
A delivery is done when it leaves and a test card is not production. Only
pickup orders waiting in Finalizado can be late, and the top strip now
shows working columns; the finished pickup keeps its card colour and its
place in Números.
2026-11-06 13:15:30 -03:00
Cauê Faleiros
c8d03d3b94 feat: designer treatment as an optional paid line (front 5)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 4m20s
Build and deploy / Publish images (push) Successful in 1m5s
TREATMENT_CENTS sets a fixed price per order; 0 keeps the option hidden.
The cart shows the designer treatment and adds 24 h; the quote total and
Tiny line carry it, and the card gets the "Tratamento pago" label. The
designer uploads the treated file through the existing card flow.
2026-11-06 13:07:22 -03:00
Cauê Faleiros
bdff73b76b feat: acceptable time per stage with late cards and alerts (front 11)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 4m24s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m0s
Gestão edits the hours and the responsible for each column. A card past the
limit turns yellow, twice the limit red, and the board lists it under
Atrasados. Números compares the real median with the limit and counts the
passages that exceeded it in the period and today.
2026-11-06 12:52:53 -03:00
Cauê Faleiros
7e22262280 feat: the Site has a videos area and a floating product video (front 4)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 4m18s
Build and deploy / Publish images (push) Successful in 1m5s
The home lists the six DTF videos with their titles and state; a card opens
a modal player. A product page gets a muted, captioned 30 s floating video
when its file is configured. The files themselves are still to be recorded;
until then the cards say "Em produção".
2026-11-06 12:44:33 -03:00
Cauê Faleiros
b10eeead6e feat: Prumo tells the card and the customer what it did (front 6)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 4m41s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m6s
Every order now carries a short report of the decisions that happened:
original format, conversion, resolution, background, residue, montage,
billed length, contraction, thin-stroke warning, parts and generation time.
The card shows it above the file; the payment summary shows the customer's
version. The upload keeps the original name so a renamed CDR/PDF is told.
2026-11-06 12:37:08 -03:00
Cauê Faleiros
25e4ac541a feat: the customer sees how long each site step is taking (0.12)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 4m26s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m0s
The file card, the sheet preview and the analysis status now count the
seconds since the file arrived; the confirmation says the Prumo is
preparing the print file and the usual estimate per 10 m.
2026-11-06 12:18:02 -03:00
Cauê Faleiros
dc87d46801 fix: Prova OK gives the parent its Prumo final and queues it (0.1)
The proof answer is the parent's check: every ready full print file Prumo
generated becomes an active final, and the parent enters Arte conferida.
Items that still need hand preparation stay in Arte recebida.
2026-11-06 12:17:57 -03:00
Cauê Faleiros
c291f00e96 docs: note where the pricing parity test runs
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 6m44s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m36s
2026-11-06 11:41:15 -03:00
Cauê Faleiros
b97b895993 docs: the phase-2 roadmap records the completed stage 0 2026-11-06 11:39:55 -03:00
Cauê Faleiros
f78cb93ba7 test: the browser walkthrough follows the new final, residue and machine rules
The final file is a 300 DPI PNG; a ready sheet offers the residue
acceptance; an oversized PNG is refused; and the pull chooses the machine.
2026-11-06 11:39:23 -03:00
Cauê Faleiros
3d1293a3af test: a unique CNPJ in the search and the reset output (0.11) 2026-11-06 11:19:41 -03:00
Cauê Faleiros
2bcdb060fd feat: the launch reset keeps the order numbering and clears the folders (0.11)
The existing launch_reset now also empties the Kanban flow folders, keeps
Estampas/, and no longer restarts orders.number: DTF-1…DTF-15 already exist
in Tiny. It still refuses real money, counts first and needs APAGAR.
2026-11-06 11:11:36 -03:00
Cauê Faleiros
6351a094f4 feat: Números measures the site and the Prumo (0.12)
The browser records page load, upload speed and bytes, Prumo's check and
the loose-art montage; the quote keeps them and Números shows average and
p95 per period. Print generation and the payment-to-card time come from
the database. The upload bar already estimates its remaining time.
2026-11-06 11:09:36 -03:00
Cauê Faleiros
945c9e366a feat: the phase-2 reset script and the proof-order contact rule (0.11)
reset_board deletes orders, quotes, cards, uploads and their history, and
empties the Kanban flow folders while keeping Estampas and every setup
record. It is a dry run unless --yes is passed, and never resets the order
numbering. A proof order closes contact with Prova OK; orders without a
proof keep their "Contato feito" action.
2026-11-06 11:04:11 -03:00
Cauê Faleiros
054a642a61 test: the suite follows pull-only machines, the proof lock and 200 DPI
The old tests created orders with an automatic machine and moved them
without one. They now choose a machine or pass it to the pull, expect the
proof lock before any move, and use the 200 DPI clean grade.
2026-11-06 11:02:43 -03:00
Cauê Faleiros
392e7da85b fix: the proof crops the finest stroke and closes the contact wait (0.1)
The browser records where the thinnest stroke sits in the assembled film;
the proof takes a 15 cm window around it instead of always the top. A free
proof no longer fails the layout's billed-metres check, and answering the
proof card clears "Aguardando contato" and ends its timer.
2026-11-06 11:02:39 -03:00