docs: commit the operator guide's source and record the Week-2 report
The operator guide is now built from docs/guias/operador/ by docs/guias/imprimir.sh, with the corrections on Tiny and the WhatsApp notices. The roadmap records the guide, the history fix found while writing it, and the Week-2 report as sent. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -934,7 +934,23 @@ print-file evidence still need correction before this item can close.
|
||||
and fictional orders. The payment step has no screenshot until Mercado Pago
|
||||
is configured, and the guides name the provisional Kanban domain; regenerate
|
||||
them when either changes. Early work toward Week 3's "orientação à operação".
|
||||
- `[ ]` Week-2 client report, due end of day 2026-09-25.
|
||||
- `[x]` Operator guide rebuilt from a committed source (2026-09-25):
|
||||
`docs/guias/operador/` (HTML and the original screenshots, cropped as
|
||||
before), printed by `docs/guias/imprimir.sh`. The source of the 09-24 PDF
|
||||
was never committed. Corrected: stage moves do not update Tiny (only
|
||||
"Aprovada" and, for pickup, "Pronto para envio", once enabled); WhatsApp
|
||||
notices go through the client's Tiny -> n8n flow; the correction notice is
|
||||
not automatic, the reason is in Minha conta; the Tiny card's renewal,
|
||||
"Verificar" and "Testar conexão" checks. Found while writing it: the
|
||||
customer's order history showed operators' internal reasons for moving an
|
||||
order back; it now omits back moves and shows reasons only for corrections.
|
||||
The Site guide's source is also not in the repository.
|
||||
- `[x]` Week-2 client report (`Relatorio-Semana-2-DTF.docx`), written 2026-09-25,
|
||||
sent 2026-09-28. Before sending, the FlexiPRINT import was taken out of
|
||||
"O que falta" (it is done this week) and the print-file paragraph no longer
|
||||
names PSD, AI, CDR or multi-page PDFs as hand-preparation cases: generating
|
||||
those is Week 3 work (1.4). Freight is reported as Jadlog data received,
|
||||
waiting on packaging weight and dimensions and the charging policy.
|
||||
- `[x]` Week-1 client report (`Relatorio-Semana-1-DTF.docx`), corrected 2026-09-18 to
|
||||
remove the inaccurate "Arquivo por metro permanece separado, com seleção explícita"
|
||||
claim and the internal commit reference.
|
||||
|
||||