All checks were successful
Build and deploy / Validate source (push) Successful in 11s
Build and deploy / Integration suite on a real stack (push) Successful in 4m27s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m19s
Asked by Dropstar on 2026-10-23 and agreed on 2026-10-26. The automatic folder becomes "Pastas dos pedidos": one main folder is chosen once, in Chrome or Edge on a factory computer that reaches the server, and the Kanban keeps three folders inside it, moved with the card. - Arte recebida: the order's file as soon as the order arrives - Arte conferida: the queue; the file moves there with the card and stays while it prints and is checked in Revisão - Finalizado: when the order is released, kept 30 days - Correção, a cancellation or a deletion takes the file out; a replaced final is swapped - orders already printing when the folder is chosen are not downloaded; a file someone took out comes back only when its order moves on, so the server now returns the files of orders the folders hold while they print, are checked and finish - Firefox, which cannot write into folders, still only downloads the files entering Arte conferida Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Documents
| File | What it is |
|---|---|
reuniao-2026-09-09-anotacoes.pdf |
Meeting notes that set the business direction: the bottleneck, the 24h goal, the automation and payment decisions. Still the record of what was asked for. |
roadmap-cliente.pdf |
The client-facing plan, as last sent. Generated by tools/generate_dtf_report.py; regenerate rather than edit. |
historico/ |
The original specification and prototype documents. Background only — they describe a model this system does not implement. |
Current engineering documents live at the repository root: CONTEXT.md for how
the system works, ROADMAP.md for what is outstanding, LOCAL_SETUP.md to run
it, PORTAINER.md to deploy it, SECURITY_REPORT.md and PRODUCTION_INPUTS.md
for the security position and the decisions still owed by the client.
Weekly client reports are deliverables, not repository content. They are produced for a specific week and are deliberately not versioned here.