The 24/09 guide said files go up to 128 MB (5 GB now), that the team reviews every quote before payment (the Site approves it), that payment is PIX or card (credit card or PIX, on a page of its own), that WhatsApp notices go out at four moments (two do; the team sends the correction notice), and showed the order number customers no longer see. It lacked Minha conta, freight by CEP, choosing which cart items to pay and the refusal messages, and its status page was from week 2. Rebuilt in the operator guide's format, source in docs/guias/site, new screenshots from the local stack with fictional customers; imprimir.sh prints both guides. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Documents
| File | What it is |
|---|---|
reuniao-2026-09-09-anotacoes.pdf |
Meeting notes that set the business direction: the bottleneck, the 24h goal, the automation and payment decisions. Still the record of what was asked for. |
roadmap-cliente.pdf |
The client-facing plan, as last sent. Generated by tools/generate_dtf_report.py; regenerate rather than edit. |
historico/ |
The original specification and prototype documents. Background only — they describe a model this system does not implement. |
Current engineering documents live at the repository root: CONTEXT.md for how
the system works, ROADMAP.md for what is outstanding, LOCAL_SETUP.md to run
it, PORTAINER.md to deploy it, SECURITY_REPORT.md and PRODUCTION_INPUTS.md
for the security position and the decisions still owed by the client.
Weekly client reports are deliverables, not repository content. They are produced for a specific week and are deliberately not versioned here.