All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m34s
Build and deploy / Secret scan and release gate (push) Successful in 4s
Build and deploy / Publish images (push) Successful in 1m1s
D-29 keeps the release with the Revisor, so nobody in the room releases their own print; the Administrador, Dropstar's own login, may release as well (the user, 2026-10-28). Gestao, Designer and Operador still cannot. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Documents
| File | What it is |
|---|---|
reuniao-2026-09-09-anotacoes.pdf |
Meeting notes that set the business direction: the bottleneck, the 24h goal, the automation and payment decisions. Still the record of what was asked for. |
roadmap-cliente.pdf |
The client-facing plan, as last sent. Generated by tools/generate_dtf_report.py; regenerate rather than edit. |
historico/ |
The original specification and prototype documents. Background only — they describe a model this system does not implement. |
Current engineering documents live at the repository root: CONTEXT.md for how
the system works, ROADMAP.md for what is outstanding, LOCAL_SETUP.md to run
it, PORTAINER.md to deploy it, SECURITY_REPORT.md and PRODUCTION_INPUTS.md
for the security position and the decisions still owed by the client.
Weekly client reports are deliverables, not repository content. They are produced for a specific week and are deliberately not versioned here.