All checks were successful
Build and deploy / Validate source (push) Successful in 1m30s
Build and deploy / Integration suite on a real stack (push) Successful in 4m2s
Build and deploy / Secret scan and release gate (push) Successful in 14s
Build and deploy / Publish images (push) Successful in 1m48s
- the home example priced as the ready sheet it shows (nota 92, R$ 14,90) - opening hours 7h to 18h, and art sent at any time - uploads up to 1 GB, every file scanned - a Designer profile: artwork and corrections on every order, moving only among Arte recebida, Arte conferida and Correção - Números by date range, per machine, and orders apart from passages Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Documents
| File | What it is |
|---|---|
reuniao-2026-09-09-anotacoes.pdf |
Meeting notes that set the business direction: the bottleneck, the 24h goal, the automation and payment decisions. Still the record of what was asked for. |
roadmap-cliente.pdf |
The client-facing plan, as last sent. Generated by tools/generate_dtf_report.py; regenerate rather than edit. |
historico/ |
The original specification and prototype documents. Background only — they describe a model this system does not implement. |
Current engineering documents live at the repository root: CONTEXT.md for how
the system works, ROADMAP.md for what is outstanding, LOCAL_SETUP.md to run
it, PORTAINER.md to deploy it, SECURITY_REPORT.md and PRODUCTION_INPUTS.md
for the security position and the decisions still owed by the client.
Weekly client reports are deliverables, not repository content. They are produced for a specific week and are deliberately not versioned here.