Commit Graph

67 Commits

Author SHA1 Message Date
Cauê Faleiros
034f3bfbb5 feat: new layout phase A, Phosphor icons and shared pieces
Roadmap Novo Layout, phase A: every icon (IC, the stage marks, the rail
and the inline icons in kanban.html, the theme toggle and the select
chevrons) is Phosphor regular, filled at 256. Shared pieces from the
canvas for the next phases: switch, tag, data table, dialog scoping,
two- and three-column grids, tab counts in the lighter grey, and 44 px
controls on the phone. Built by Prensa.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-13 15:31:38 -03:00
Cauê Faleiros
aae8a8d49a refactor: the Pagamentos and Integrações tabs in web/kanban-integrations.js
A pure move of kanban.js's Payments and integrations section,
byte-identical, loaded after kanban-users.js (Critical Corrections 7,
fourth step). The browser test opens both tabs.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-11 16:45:22 -03:00
Cauê Faleiros
8d9a59b210 Merge branch 'fix-front-users' into integration
# Conflicts:
#	tests/browser_test.mjs
#	web/kanban.html
#	web/kanban.js
2026-11-11 16:08:42 -03:00
Cauê Faleiros
77c04633e2 refactor: the Usuários tab, machines and machine sheet in web/kanban-users.js
A pure move of kanban.js's Machines and users section (with the account
menu, theme and filter wiring that sat inside it), byte-identical, loaded
right after kanban-numbers.js (Critical Corrections 7, third step). The
browser test opens Usuários so a missing name fails it.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-11 16:08:14 -03:00
Cauê Faleiros
fb3a5003b8 refactor: the Cotações tab in web/kanban-quotes.js
A pure move of kanban.js's Quotes section, byte-identical, loaded right
after kanban-numbers.js (Critical Corrections 7, second step). The browser
test opens Cotações so a missing name fails it.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-11 16:08:05 -03:00
Cauê Faleiros
61548fd6b2 Merge main into sentry
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-11 14:48:01 -03:00
Cauê Faleiros
457ed4cbdf feat: Sentry in the API, the worker, the Site and the Kanban (off until the DSNs are set)
app/observability.py starts sentry-sdk for the API and the worker when
SENTRY_DSN_API is set, with send_default_pii off and a scrub that strips
cookies, tokens, bodies, CPF/CNPJ and e-mails. The browser loads the
official Sentry bundle from our own origin (web/vendor, provenance in its
README) and starts with SENTRY_DSN_WEB from /api/session or
/api/operator/me; every failed API answer the customer or the team gets is
reported with its path, status and message, never the request body. The
CSP allows Blyzer's Sentry ingest host.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-11 14:48:01 -03:00
Cauê Faleiros
49e5ff2081 Merge front 7a.4: montador Venda with shipping
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-11 14:46:42 -03:00
Cauê Faleiros
b4b34ab3fb feat: montador Venda with shipping at the Site's freight (front 7a.4)
A Venda can now ship: CEP lookup, the address, and the Site's freight
options for the packed metres; the server quotes the freight again at
approval, adds it to the total and keeps the destination, so Tiny gets the
freight and carrier like a Site order.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-11 14:21:13 -03:00
Cauê Faleiros
9fd90f33d6 Merge main into label
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-11 11:32:27 -03:00
Cauê Faleiros
223bd61798 feat: the 10x15 label at Finalizado (Marcus 10/11, point 10)
When an order reaches Finalizado, the Kanban on the computer that opted in
(Integrações > Etiqueta 10x15) prints a 10x15 label rendered by the server:
the Tiny order number in large type (DTF-<n> when there is none), customer,
DTF · N folhas · X m, the delivery line, date and time, the Revisor and a
QR with the number. One automatic print per order (label_prints, claimed
once); Revisor, Expedição, Gestão and the administrators can reprint.
Chrome with --kiosk-printing prints without the dialog.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-11 11:32:27 -03:00
Cauê Faleiros
b5a51137fb feat: montador Interno and Venda, Tiny customers, brand per stamp (front 7a.3, Marcus 10/11)
Interno: the Expedição assembles the marketplace's own sales on the fixed
internal customer Gestão fills in once; no Tiny order, no paid e-mail,
marked interno, it stays in house. Venda: a Vendedor or Gestão picks the
customer from the Tiny base and the order goes to Tiny like an approved
quote, faturado (Boleto from TINY_RECEIPT_BOLETO when set), pickup or
'junto com o pedido de roupa nº X'. Números counts both at table price,
apart from cash (and the average ticket over cash orders only). Each stamp
can carry a brand and a public flag for the future catalogue.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-11 11:01:44 -03:00
Cauê Faleiros
09ff22cde5 refactor: the Números tab in web/kanban-numbers.js
A pure move of kanban.js's Numbers and Máquinas, mês a mês sections,
byte-identical, loaded right after kanban.js like the Site tab. Loading
now waits for DOMContentLoaded: load() could run while the parser waited
for a later tab's script (Critical Corrections 7, first step).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-10 10:46:24 -03:00
Cauê Faleiros
31dbd0b062 Merge main into front-7a
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>

# Conflicts:
#	.gitea/workflows/deploy.yml
2026-11-09 15:40:55 -03:00
Cauê Faleiros
2c80de0c0a feat: Montar creates the invoiced order card (front 7a.2b)
The montador sends each stamp to storage, splits the list into items of
at most 20 sources and 4000 copies, packs each one with the Site's engine
and creates the order in Arte recebida: typed customer, pickup, the Site's
table price, payment 'faturado', origin dropflow for Expedição and
atendimento otherwise. Until Dropstar decides, these orders do not go to
Tiny and the customer gets no paid e-mail. Vendedor and Expedição may now
upload through the operator upload routes (can_any).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 15:27:04 -03:00
Cauê Faleiros
60105e7cbe feat: Site videos up to 500 MB
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 6m23s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m6s
Dropstar uploads the six videos themselves; 100 MB was our own limit and
could stop a longer video in the videos area. ClamAV scans up to 2000 MiB,
so 500 MB is still scanned.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 15:26:36 -03:00
Cauê Faleiros
8993eb25db Merge branch 'main' into front-7a
# Conflicts:
#	app/schema.sql
2026-11-09 15:10:55 -03:00
Cauê Faleiros
2f85a38562 feat: the videos panel in the Site tab, captions optional (front 8.4)
Dropstar uploads the six videos themselves, so the panel moves from
Integrações to the Site tab, next to products and prices. A video can be
published without a VTT: the Site plays it without a captions track.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 14:50:18 -03:00
Cauê Faleiros
04761e63e3 feat: the Site's packing engine shared with the montador's real layout (front 7a.2a)
The packing engine moves verbatim from web/site-packing.js to
web/packing.js, loaded by the Site and the Kanban. Montar folha packs the
list with it after every change and draws the sheet, showing the real
length instead of the estimate.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 14:25:15 -03:00
Cauê Faleiros
7a5116ab19 Merge main into front-7a
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>

# Conflicts:
#	.gitea/workflows/deploy.yml
#	app/app.py
#	app/schema.sql
#	web/kanban.html
#	web/kanban.js
2026-11-09 14:14:25 -03:00
Cauê Faleiros
c88d81588e feat: products and prices from the database, edited in the Kanban's Site tab (front 8.1)
Gestão and the administrators switch each product on and off and set its
price from a start date; a price that has started is history and cannot
change, a scheduled one can be cancelled. The Site and the server read
the current price; with no row the code's prices and TREATMENT_CENTS
still apply, so nothing changes until someone sets one. A switched-off
product disappears from the Site and new quotes with it are refused.
Approved quotes and paid orders keep their price.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 13:50:45 -03:00
Cauê Faleiros
e9db9dec06 feat: Expedição profile, stamp sizes and the Montar folha screen (front 7a.1)
The new Expedição profile and the seller may assemble sheets (capability
assemble). Gestão edits the size table (letter and width). The Montar tab
reads Estampas/<code>-<size>.png or <code>.png from the orders folder,
checks the resolution with the Site's 96/200 DPI ruler, merges repeated
lines and estimates the metres. Montar itself is slice 2.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-09 13:34:43 -03:00
Cauê Faleiros
4219db8215 feat: Números per machine, month by month (front 1b)
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 5m58s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m4s
A new Números section, "Máquinas, mês a mês", one column per machine
and a month at a time: metres printed, metres per hour and hours
running (time shared by two orders counted once), hours stopped with
their reasons; metres per film roll, ink per 100 m by colour, powder
per 100 m; supplies, parts and total cost per metre; what the printed
orders sold, the month's contribution and since installation; and the
return in % and months to pay back once Gestão types the price.

Refills stand for consumption. Every ratio without data shows "—".

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 12:50:48 -03:00
Cauê Faleiros
1a9611942d feat: an approved order nobody paid expires in 24 h (front 9)
All checks were successful
Build and deploy / Validate source (push) Successful in 1m15s
Build and deploy / Integration suite on a real stack (push) Successful in 5m10s
Build and deploy / Secret scan and release gate (push) Successful in 11s
Build and deploy / Publish images (push) Successful in 1m29s
An approved quote with no payment expires on its own after 24 h, never
while a Pix or card attempt is still live: the worker marks
quotes.expired_at, frees its files and e-mails the customer that the
order expired and can be sent again on the Site. The backlog from before
this front expires silently.

Kanban: Cotações › Aguardando pagamento shows when each one expires and
the review gets an "Abrir conversa" WhatsApp button; Números gets
"Pedidos sem pagamento" (made, paid, expired, waiting, abandonment rate).

release_files moves to app/payments.py so the worker can use it; an
expired quote no longer counts as open there. New tests/unpaid_test.py
in the integration job.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-09 10:01:26 -03:00
Cauê Faleiros
a712c69aca fix: align proof, treatment, metrics and site videos with PDF
All checks were successful
Build and deploy / Validate source (push) Successful in 11s
Build and deploy / Integration suite on a real stack (push) Successful in 5m44s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m22s
2026-11-06 15:27:48 -03:00
Cauê Faleiros
f4cd1842ca fix: Atrasados lists production stages and real orders only (front 11)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 4m27s
Build and deploy / Publish images (push) Successful in 1m6s
A delivery is done when it leaves and a test card is not production. Only
pickup orders waiting in Finalizado can be late, and the top strip now
shows working columns; the finished pickup keeps its card colour and its
place in Números.
2026-11-06 13:15:30 -03:00
Cauê Faleiros
bdff73b76b feat: acceptable time per stage with late cards and alerts (front 11)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 4m24s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m0s
Gestão edits the hours and the responsible for each column. A card past the
limit turns yellow, twice the limit red, and the board lists it under
Atrasados. Números compares the real median with the limit and counts the
passages that exceeded it in the period and today.
2026-11-06 12:52:53 -03:00
Cauê Faleiros
6351a094f4 feat: Números measures the site and the Prumo (0.12)
The browser records page load, upload speed and bytes, Prumo's check and
the loose-art montage; the quote keeps them and Números shows average and
p95 per period. Print generation and the payment-to-card time come from
the database. The upload bar already estimates its remaining time.
2026-11-06 11:09:36 -03:00
Cauê Faleiros
8b7d9f0bdb feat: "Abrir e conferir", the print file full screen, in pieces (item 7)
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 4m28s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m17s
The card's "Abrir e conferir" opens the order's print file full screen
(Dropstar's third round, item 7): zoom up to 100% real (one file pixel, one
screen pixel), the position in cm, the order's files one after the other
without closing, and the background behind the transparency light, dark or
checkered, remembered (Dropstar, 2026-10-30). Closed in Arte recebida, it asks
"Está OK?": the class of each item, prefilled with the measure, then
"Mover para Arte conferida" (the final approved, the class kept, the card
moved) or "Tratar a arte".

A 15 m film is loaded like a map: while the PNG is written, its strips of
512 rows go to storage at 100% and at each halving (app/printtiles.py,
originals/tiles/<upload>/), and the viewer (web/kanban-viewer.js) fetches
only those on screen. They go when their file expires. Storing a print file
that fails is now an attempt like a failed render, not a claim held for an
hour.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 20:10:03 -03:00
Cauê Faleiros
df601a7b6e fix: Números' rework meters are thin bars again
All checks were successful
Build and deploy / Integration suite on a real stack (push) Successful in 3m30s
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m11s
The panel filler and the meter's bar were both called .fill, so every bar
took the filler's 460 px; the filler is .fillbox now.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 16:53:25 -03:00
Cauê Faleiros
0b8eb143ad feat: the Kanban on the phone follows the phone mockup
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m40s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 56s
- Top bar with the logo, search and filters; at the bottom Produção,
  Cotações, Pagamentos, Números and "Mais" (Integrações, Usuários, the
  machine, the theme, the password, Sair) in a sheet.
- Produção: the stages as chips, the stage's metres and the session's
  machine over the cards, the queue's download as a button, the
  filters (product included) in a sheet.
- The order as a page: back, the order and its stage, the next step
  with its buttons at the bottom, the facts as rows, WhatsApp, Arquivos
  and Histórico; its actions in a sheet. A quote opens the same way.
- Pagamentos as cards, Números as the mockup's figures, chart and
  lists, Usuários as a list, Integrações as cards, the search as a page,
  dialogs as sheets, and the sign-in with the sheet rolling on top.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 15:00:08 -03:00
Cauê Faleiros
f5c8bcfb90 fix: Kanban panels keep their size; their lists scroll inside
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m35s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m1s
Creating users, machines or orders no longer changes the screen: Pessoas
and the Tiny log have a fixed height, Máquinas shows two and scrolls,
Pagamentos fills the window, Números' machines and treated art scroll in
their panels, and the board fills the window with each column scrolling
under its head. On the phone the pages scroll as before.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 14:42:18 -03:00
Cauê Faleiros
d2e340032e fix: the Kanban's login fits the window, the menus are the mockup's again
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m31s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m8s
- Sign-in: the page is the window's height, never scrolls; the sheet
  rolling under the marks is the design's (docs/design/folha-sapo-flor.svg).
- The account, refresh and order menus had lost their look with the old
  panel's rules; they are popovers again. The account menu leaves the
  theme to the rail's button, right above it.
- Números: panels of a row share their height; rework's lists by
  printer and waiting fold under a line.
- Cotações: the chips of the mockup (Têxtil, UV, Folha, Avulsa, Com
  ressalva), no field of its own; a customer from the top search shows
  as a tag that takes the filter off.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 14:25:53 -03:00
Cauê Faleiros
6f294e168b feat: the Kanban's new screens, from the board to the phone (redesign, steps 2 to 8)
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 4m37s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m10s
- Board: product switch and a filters panel with counts, cards that say
  the next step and the most urgent mark, Imprimindo in one lane per
  machine with its free places, Finalizado as short cards.
- Order panel: the stage and codes on top, "Próximo passo" with its
  button, Pedido / Arquivos / Histórico tabs; going back, contact,
  rework and cancelling in a menu; every form in a dialog.
- Cotações, Pagamentos, Integrações, Números (a calendar for the
  period) and Usuários (who is on the system now, what each profile
  does, the machines) in the design's panels; the sign-in page.
- Phone: sections at the bottom, one stage at a time, the order and
  the dialogs over the whole screen.
- API: each session records when it was last used (at most once a
  minute), for "Ativo agora"; the board says who is on each machine.
- .dockerignore leaves the local test files out of the build.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 13:58:05 -03:00
Cauê Faleiros
c76d2fa7f3 feat: the Kanban's frame, a rail of sections and a new top bar (redesign, step 1)
All checks were successful
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 54s
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m54s
The sections move from tabs in the top bar to a rail on the left, with
an icon each, the counters for Cotações, Pagamentos and Integrações, the
light/dark switch and the account button at the bottom. Its menu holds
"Trocar de máquina", the theme, "Minha senha" and "Sair". The machine of
the session shows in the rail and as a chip in the top bar, both opening
the machine question.

The top bar carries the page's name (Produção also says what is open:
"13 pedidos, 17,40 m em produção"), the search, Tiny only when it needs
attention, and "Atualizado às 09:18": a click there sets how often it
updates by itself, over the same remembered setting, or updates now.
The pages' own headings are gone; on narrow screens the rail lies along
the top until their own layout.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 09:19:45 -03:00
Cauê Faleiros
05139b71ff feat: the Kanban's new base, dark and light (redesign, step 0)
All checks were successful
Build and deploy / Validate source (push) Successful in 1m46s
Build and deploy / Integration suite on a real stack (push) Successful in 4m29s
Build and deploy / Secret scan and release gate (push) Successful in 9s
Build and deploy / Publish images (push) Successful in 1m25s
The design canvas's tokens replace the old palette, with a light theme
beside the dark one: the account menu switches them, and each browser
remembers its choice (web/theme.js, loaded in the head so the page never
flashes the other theme). Every hard-coded colour now goes through a
token, so the screens not redesigned yet read in both themes; their old
variable names map onto the tokens until each is rebuilt. Instrument
Sans and IBM Plex Mono replace Manrope, and the "filme descolando" logo
the D. The look before this is kept in git tag ui-v2.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 08:59:37 -03:00
Cauê Faleiros
db877c52e6 feat: the machine is chosen at sign-in, per session (Dropstar's third round, item 12)
Some checks failed
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Failing after 2m32s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Has been skipped
After signing in, the Kanban asks "Em qual máquina você está?": required
for the operator, optional for Gestão and Administrador ("Não estou em
máquina"), never for the other profiles. The session keeps it until it
ends or is changed from the header, where the machine shows in green;
one person on two computers runs two machines. Someone else already on
the machine is a warning, not a refusal.

Operators see the whole board (no more per-machine filter). From Arte
conferida they pull any card, which becomes their machine's (a machine
that does not print its product refuses it); they move only their
machine's cards, and the others show without drag or buttons. Their
cards and their machine's row in Imprimindo are outlined in green. The
history records the machine with the person: "Imprimindo · Thales ·
máquina2". Usuários shows who is on each machine now, read-only; the old
operator/machine assignment is no longer read.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 13:18:24 -03:00
Cauê Faleiros
8c053596b7 feat: the Financeiro profile (Dropstar, 2026-10-30)
All checks were successful
Build and deploy / Validate source (push) Successful in 14s
Build and deploy / Integration suite on a real stack (push) Successful in 4m44s
Build and deploy / Secret scan and release gate (push) Successful in 9s
Build and deploy / Publish images (push) Successful in 1m12s
Financeiro sees the whole board, Pagamentos, Números and Cotações, and
cancels an order with its reason. It moves no card and touches no file;
resolving a payment stays with Gestão and Administração. Two narrower
capabilities carry it: "payments" (the Pagamentos list) and "cancel",
which used to need "manage". The order panel's menu shows each profile
only what it may do.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 12:56:53 -03:00
Cauê Faleiros
b08a258931 feat: the Administrador may release orders to Finalizado too
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m34s
Build and deploy / Secret scan and release gate (push) Successful in 4s
Build and deploy / Publish images (push) Successful in 1m1s
D-29 keeps the release with the Revisor, so nobody in the room releases
their own print; the Administrador, Dropstar's own login, may release as
well (the user, 2026-10-28). Gestao, Designer and Operador still cannot.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-28 10:34:24 -03:00
Cauê Faleiros
5692804c6f feat: rework register, opened by Gestao with a locked cause and authorized by an Administrador (Dropstar's rules D-02 to D-04)
All checks were successful
Build and deploy / Validate source (push) Successful in 10s
Build and deploy / Integration suite on a real stack (push) Successful in 3m27s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m2s
Gestao opens a rework from the order panel with its cause (falha de
impressao, perfil de cor, erro de tratamento, erro de pedido, or arte
aprovada pelo cliente, outside the goal), the metres redone and a note; the
cause never changes. An Administrador authorizes or declines it with a
reason, never one they opened, and only an authorized rework counts. The
order keeps who printed it. Numeros shows the metres redone per cause over
the film printed, against 0,4% per cause and 1,6% for the house, by who
printed, and the reworks waiting for authorization. Vendedor goes back to
viewing only (D-30): registering orders paid outside is Administrador and
Gestao.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 13:09:56 -03:00
Cauê Faleiros
c45e5f732b feat: the team registers an order paid outside the site, choosing its origin and payment (Dropstar's rule D-35)
Some checks failed
Build and deploy / Integration suite on a real stack (push) Failing after 3m26s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Has been skipped
Build and deploy / Validate source (push) Successful in 6s
On an approved quote in Cotacoes, Administrador, Gestao and Vendedor pick
the origin (Site, Dropflow, Atendimento) and how it was paid (Pix, cartao,
dinheiro, credito do cliente), neither preselected, with an optional note.
The price is the quote's, the Site's table price. The order is marked paid
outside, counts in Numeros, and goes to Tiny like a Site order with the
payment named in its internal note; a Dropflow order stays out of Tiny,
status updates and cancelling included, until its revenue category exists.
Auto-refresh waits while a register form on screen is half filled in.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 12:36:40 -03:00
Cauê Faleiros
0319039328 feat: every order is born with its origin, shown, filtered and counted (Dropstar's rules D-21 and D-35)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m21s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m1s
Orders carry site, dropflow or atendimento, required and with no default,
limited to the three. The Site's orders are marked site where they are
created; older orders became site. The Kanban shows the origin on each card
and in the order panel, filters by it, and Numeros has a Por origem table:
orders, metres, money and time from payment to Finalizado per way in.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 11:39:08 -03:00
Cauê Faleiros
494925dff4 feat: time in "Aguardando contato" no longer counts in Números (Dropstar's rule D-38)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m20s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m0s
Dropstar's internal rules (2026-10-26): waiting for a word with the customer
has no deadline and does not enter the time figures.

- each wait is kept, from the mark to "Contato feito" (and from checkout when
  the customer asks for a proof), in a new table; waits open today are
  recorded from their start
- the time in each stage and "Do pagamento ao Finalizado" leave those waits
  out, and the Números page says so

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 10:45:14 -03:00
Cauê Faleiros
35e64d77d7 feat: "Arte tratada" flags the orders whose final the team prepared, counted in Números
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m20s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 58s
Dropstar's internal rules (2026-10-26) asked how to tell art that arrived
ready from art the designer had to fix, and Marcus agreed on 2026-10-27 to
mark it automatically, for the designer's productivity.

- an order whose approved final is not the customer's art (not the file the
  system generated from it, not one of their originals, not a correction
  they sent) shows "Arte tratada" on its card and in the order, with who
  approved it
- Números counts the period's treated orders, the share of all orders, and
  how many each person approved
- the Kanban's cancel text: the money stays as the customer's credit, in
  Dropstar's financial control (rule D-15), no longer a refund
- Números' machine table shows the orders waiting in Arte conferida again;
  it still looked for the old print queue

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 10:01:35 -03:00
Cauê Faleiros
f77de40b7f feat: Gestão only pulls cards back, with a reason (Dropstar's rule D-20)
All checks were successful
Build and deploy / Validate source (push) Successful in 10s
Build and deploy / Integration suite on a real stack (push) Successful in 4m5s
Build and deploy / Secret scan and release gate (push) Successful in 10s
Build and deploy / Publish images (push) Successful in 1m33s
Dropstar's internal rules of 2026-10-26: the coordination pulls back, never
forward, always with a reason. The Gestão profile now sends orders to
Correção from any stage and steps them back, and no longer moves them
forward. Admin, Dropstar's own login, keeps every move but Finalizado, which
stays the Revisor's (D-29).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 09:16:00 -03:00
Cauê Faleiros
b6f20733fa feat: Dropstar's new flow: Arte conferida is the queue, Revisão and the Revisor
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 3m36s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m24s
The board Dropstar drew on 2026-10-23: Arte recebida, Arte conferida,
Imprimindo, Correção, Revisão, Finalizado.

- Fila de impressão leaves the board: Arte conferida is the queue. It takes
  an order only with every item's final approved, keeps the finals as
  approved, orders its cards for printing and has the room's "Baixar" and
  the automatic folder. Orders that were in the queue move there once, with
  a line in their history
- Revisão checks the printed sheet, and the new Revisor profile is the only
  one that sends an order to Finalizado (the superadmin too, for support)
- who moves what, from the server (MOVES): the designer the artwork, asking
  for corrections and bringing the new art back; the operator Arte conferida
  to Imprimindo to Revisão; admin and gestão everything else, Correção
  included; a step back belongs to whoever makes the move it undoes
- Tiny: Arte conferida is "Preparando envio" and Finalizado "Pronto para
  envio", for delivery orders too
- Prova OK still comes before Finalizado; the customer's portal shows the
  new steps

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 12:45:57 -03:00
Cauê Faleiros
fc3c08aced feat: the board's filters in one panel: product, machine, delivery and situation, combined
All checks were successful
Build and deploy / Validate source (push) Successful in 8s
Build and deploy / Integration suite on a real stack (push) Successful in 3m20s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m8s
The row of fifteen chips, one filter at a time, becomes a Filtros button
with four lists. The choices combine (Têxtil on máquina2, waiting for
contact), each option says how many orders it would show, and the
filters in use stay beside the button as tags taken off with a click.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 15:39:59 -03:00
Cauê Faleiros
3ae453f47a fix: Números measures what Dropstar asked: machines by film printed, stages by order
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m23s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m7s
- a machine's metres are the film printed, not the metres billed, which round
  up to one metre and made small orders look like fast printing
- orders in Imprimindo together on one machine count that time once
- a stage's median time is per order, the sum of its passages, so rework
  reads as one slow order instead of quick passages

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 15:25:08 -03:00
Cauê Faleiros
d4494a0654 feat: Dropstar's corrections of 21/10 that need no answer from them
All checks were successful
Build and deploy / Validate source (push) Successful in 1m30s
Build and deploy / Integration suite on a real stack (push) Successful in 4m2s
Build and deploy / Secret scan and release gate (push) Successful in 14s
Build and deploy / Publish images (push) Successful in 1m48s
- the home example priced as the ready sheet it shows (nota 92, R$ 14,90)
- opening hours 7h to 18h, and art sent at any time
- uploads up to 1 GB, every file scanned
- a Designer profile: artwork and corrections on every order, moving only
  among Arte recebida, Arte conferida and Correção
- Números by date range, per machine, and orders apart from passages

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 10:09:15 -03:00
Cauê Faleiros
53c6234feb feat: machines share the work by metres open, with an optional limit, their load on show and operators set from the machine
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m31s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 59s
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 10:28:13 -03:00