Commit Graph

6 Commits

Author SHA1 Message Date
Cauê Faleiros
b81ff8d03d feat: give each Site product and the cart its own page
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 2m28s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m52s
The home, each product's Montagem and the cart now have their own
addresses (/artes-avulsas, /arquivo-por-metro, /uv-artes-avulsas,
/uv-arquivo-por-metro, /carrinho) and show only their own content, with
Back, Forward, reload and direct links working as in any store. They stay
one document so uploaded artworks survive moving between pages; nginx
serves index.html for these addresses.

"Adicionar ao carrinho" puts the item in the cart and opens it, and an
empty cart says so. Portal quote links open in the cart. Also fixes the
"57 cm" line break on the ready-sheet option, returns "Novo pedido" to
the home, and says PDF depends on the product.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-24 16:56:58 -03:00
Cauê Faleiros
2e03b0362b feat: undo mistaken moves, numbered pagination, and quieter Kanban messages
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 2m33s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m48s
Moves: an order can go back one stage (BACK in app/runtime.py) with an
internal reason, flagged in the history as movements.back. The customer is
not notified and approved finals stay; "production started" and "ready" are
now enqueued once per order, so undoing and redoing a move sends nothing
twice. Dragging only goes forward and highlights the allowed column. Move
errors are in Portuguese.

Lists: the send log, payments (open, resolved as history, all) and quotes
are paged on the server with a total, 20 rows by default (10/20/50/100),
first/previous/page/next/last. The send log filters by destination, status,
event and order. Older finished orders load on demand. The board no longer
carries the send log or payment rows, only the open-payment count.

Kanban: Pagamentos and Integrações are separate tabs; messages are brief,
bottom notifications that clear themselves; wording is shorter.

Full CI integration sequence passes locally, with new checks for undo, paging
and filters.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-24 16:01:31 -03:00
Cauê Faleiros
99a558ddd9 feat: redesign the Kanban and keep test wording out of production
All checks were successful
Build and deploy / Validate source (push) Successful in 11s
Build and deploy / Integration suite on a real stack (push) Successful in 3m3s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m51s
Kanban: tabs for production, quote review and payments/integrations; compact
cards with products, metres, print-file status, delivery and time in stage;
an order panel with stage progress, one main action, a correction reason in
place, items with a preview drawn from the approved layout, final-file
approval and the history as a timeline. Quote review gets a list and a pane;
payment issues resolve in place; integrations show their real state, Tiny's
connection with a read-only "Testar conexão", and a readable send log. The
previous Kanban is kept in git tag ui-v1 and is no longer served.

Production wording: the customer portal no longer says it is a local test
environment outside the local stack; the checkout no longer tells customers
to use the Kanban or shows internal stage codes; sign-in, session, quota and
print-file messages are Portuguese and never say "local". A simulated freight
price is refused outside the local stack until a real freight provider
exists, so production only offers pickup.

The browser suite drives the new tabs and panel and still checks the whole
upload, quote, payment and production journey. Full CI sequence passes locally.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-24 15:28:04 -03:00
Cauê Faleiros
cfcbe545f1 ci: require manual gated releases from main
All checks were successful
Build and deploy / Validate source (push) Successful in 1m28s
Build and deploy / Integration suite on a real stack (push) Successful in 4m3s
Build and deploy / Secret scan and release gate (push) Successful in 11s
Build and deploy / Publish images and notify Portainer (push) Has been skipped
2026-09-23 11:27:18 -03:00
Cauê Faleiros
24013458c9 fix: harden week-two ordering, artwork and operations 2026-09-23 10:40:18 -03:00
Cauê Faleiros
b329f76378 refactor: lay the repository out by role
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 1m25s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images and notify Portainer (push) Successful in 1m31s
local/ held six unrelated things under a name that stopped being true once it
became the production runtime: the service, the frontend, the tests, the ops
commands, the container definitions and the dependency lock, 65 files with
nothing to tell them apart.

  app/      the service: api/ routers, core/ for identity, database, models,
            prices and secret loading, and the worker, bootstrap and schema
  tests/    the twelve suites, no longer inside the shipped package
  ops/      backup, readiness, dependency audit, security summary
  infra/    Dockerfiles, gateway templates, ClamAV and storage configuration,
            the requirements and their hash lock
  web/      the Site, Kanban and portal pages with their scripts

deploy/Dockerfile.api now copies app/ alone, so the tests stop shipping to
production; the local image still carries them, because the suites run inside
the stack's network.

Five kinds of reference had to follow, and each was found by something different
rather than by reading. Imports of the form "from . import db" survived a rewrite
that only matched "from .db import". Tests kept relative imports of modules that
had left the package. A mock.patch target names its module in a string, where no
import rewriting can see it. The browser test resolves a fixture by path. And the
release gate's markers pointed at local/runtime.py and local/worker.py, which is
the decay its new marker test exists to catch — it caught it.

Verified from docker compose down -v: the stack starts, all six integration
suites, both browser suites and the twenty-nine unit tests pass.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-21 17:40:57 -03:00