Commit Graph

15 Commits

Author SHA1 Message Date
Cauê Faleiros
b64947eb76 fix: a proof sheet counts its real length in the machine's metres, in metres, not 15 m
PROOF_SHEET_CM (15) was added to a total in metres, so every proof counted
15 m of film: one proof was enough for the 10 m cleaning alert, and Números
overstated production. A proof now counts the film it took, the finest
stroke's window and the colour samples with the clear film between them (up
to 30 cm, Marcus, 2026-11-26), read from its print file; 15 cm for a sheet
made before the samples. One function serves the machine log and Números.
The Kanban's proof rule says 30 cm.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-27 15:03:36 -03:00
Cauê Faleiros
f35a347a28 fix: a reprint keeps an all-items choice, an undone pass to Revisão prints nothing again, and Prova OK tells Tiny (#105)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 7m56s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m26s
- Every item ticked was saved as NULL, which also means "not chosen", so the
  pass to the queue replaced it with the suggestion and only the changed
  item went to the machine; the panel showed the suggestion again. The
  choice is now the whole list.
- Undoing a pass to Revisão (back to Imprimindo) started a new round with
  every file, so FlexiPRINT printed the order again. It now writes back only
  what Flexi had not taken, and the reprint choice of that pass returns. A
  pass undone this way no longer counts its film twice in the machine's
  metres (machine log and Números).
- An order entering the queue by Prova OK never sent Tiny's "Preparando
  envio". The stage's Tiny event is now one function, used by the move and
  by the Prova OK.

Integration test follows the real moves: suggestion, all items kept, pull
onto a machine, two undone passes to Revisão, metres counted once.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-27 14:48:34 -03:00
Cauê Faleiros
b8496b858f feat: a reprint sends only the items chosen to the machine (Marcus, 2026-11-26, #105)
All checks were successful
Build and deploy / Validate source (push) Successful in 11s
Build and deploy / Integration suite on a real stack (push) Successful in 7m55s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m34s
An order the machine already printed, back in Arte conferida, sends again
only the items whose final changed since the machine took them; the panel's
"Vai para a máquina" shows and changes the choice, and the card says
"Reimpressão". The order stays one card. The pass to Revisão keeps the
items printed, so the machine's metres count only those.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-27 10:00:54 -03:00
Cauê Faleiros
5dc4135562 fix: an HTML page from the proxy is a passing outage, a full machine and a proof card in Finalizado are said before the move (DTF-WEB-1Z, 20, 21)
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 7m42s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m20s
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-27 09:26:48 -03:00
Cauê Faleiros
64a017e0a4 feat: a ready sheet's pieces under 5 mm show on the Kanban card (Marcus, 2026-11-26, #81)
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 7m52s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m29s
The Site already counted them and warned the customer; the count now travels
with the item (close_pieces) to the card's flags, the order panel and the
quote review, so the room sees it before printing.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-26 14:43:25 -03:00
Cauê Faleiros
4c6e2aac4a feat: a user may have more than one profile, and may do what any of them may (Marcus, 2026-11-26)
All checks were successful
Build and deploy / Validate source (push) Successful in 8s
Build and deploy / Integration suite on a real stack (push) Successful in 8m1s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m32s
operators.roles holds every profile, the main one first; permissions, moves,
the column order and the machine question are the sum. The operator's machine
rules apply only to the moves Operador alone allows, so an Operador who is also
Revisor releases any sheet (D-29 does not block, Marcus). Usuários gets
"Outros perfis" chips next to the main profile.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-26 10:57:20 -03:00
Cauê Faleiros
3da1c9c11c fix: a receipt another computer took is no error, and a drop on a card now on another machine says so (DTF-WEB-1N, 1P)
All checks were successful
Build and deploy / Validate source (push) Successful in 14s
Build and deploy / Integration suite on a real stack (push) Successful in 8m22s
Build and deploy / Secret scan and release gate (push) Successful in 9s
Build and deploy / Publish images (push) Successful in 2m1s
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-25 18:06:29 -03:00
Cauê Faleiros
aaa6090642 feat: places per machine, drops on Imprimindo go to your machine, a Venda carries its seller to Tiny (DTF-WEB-V)
All checks were successful
Build and deploy / Validate source (push) Successful in 10s
Build and deploy / Integration suite on a real stack (push) Successful in 7m38s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m19s
Marcus, 2026-11-17:
- Each machine has its own places (machines.places, 1 to 6, three to
  start): orders at once in Imprimindo and files at once in its hot
  folder. Admin sets it in the machine dialog; Admin and Gestão in the
  machine sheet's Dados da máquina. A third order shows as "Na vez".
- Whoever is signed in on a machine drops a card anywhere in Imprimindo
  and it goes to that machine; without one, the lane under the pointer.
- Each Kanban user may name their Tiny seller (Usuários, read from
  Tiny's own list); a montador Venda reaches Tiny with the seller of who
  assembled it. Every other order still sends no seller.
- A folder download that never reached storage (a network drop) waits
  for the next pass as a warning and is reported only if it keeps
  failing (Sentry DTF-WEB-V).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-17 14:18:19 -03:00
Cauê Faleiros
bd25cb9c1c fix: the drag to Arte conferida without approved finals guides instead of reporting an error (DTF-WEB-R)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 6m33s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m11s
The drop already opens the order on the approval step (DTF-WEB-F); its
line is guidance, like the review photo's in DTF-WEB-B, so it is no
longer red and no longer reaches Sentry.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-17 09:26:13 -03:00
Cauê Faleiros
8daf3084aa fix: a drag to Arte conferida without approved finals opens the order on that step (DTF-WEB-F)
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 6m26s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m14s
The panel only offers Arte conferida once every item's final is approved, but
the board's drop sent the move and the server refused it. The drop now says
what is missing and opens the order on "Aprovar o arquivo final", the same
pattern as the review photo guard for Finalizado (DTF-WEB-B).

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-16 13:26:56 -03:00
Cauê Faleiros
3d01b81a31 feat: new layout phase G, the phone as on the canvas
The bottom bar keeps Produção, Cotações, Pagamentos and Números; Mais opens
a sheet with the other sections (Montar, Site, Integrações, Usuários, as the
role allows, with the rail's icons) and the account (theme, password, Sair)
under their own headings, as in Ph1 and Ph2. Stage chips drop their icons and
keep the fade at the edge; the contraction fields take the full width in the
order page (Ph3). Números on the phone names each stage's limit, overruns and
waiting orders, and Por origem fits its five columns.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-16 12:45:21 -03:00
Cauê Faleiros
040ef46f94 Merge review photo checks (DTF-WEB-B, C)
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 7m11s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m10s
2026-11-16 10:37:44 -03:00
Cauê Faleiros
92ffb679d6 fix: the review photo is measured before sending, and a drag to Finalizado without it opens Revisão
Sentry DTF-WEB-C and DTF-WEB-B (order #24, 16/11): a review photo under
1600 px on its longer side was refused only after the upload (a 1280x720
webcam always is), and dragging the card to Finalizado without the photo
got the server's 409. The dialog now says the minimum, the camera shot
and a chosen photo are measured in the browser with the same message,
and the drop opens Revisão instead of a refused move.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-16 10:37:44 -03:00
Cauê Faleiros
2c740da4c1 feat: new layout phase D, the production board and stage times as on the canvas
Roadmap Novo Layout, phase D step 2 (canvas A1, D1): a late card gets
the red border and red time (warn colour for a warn late) instead of the
Atrasados strip, which is no longer shown (renderLatebar kept for later);
machine lanes with name, blocking-alert dot, free places and dashed free
slots; compact Finalizado cards; the phone stage chips fade at the edge.
"Tempo aceitável de cada etapa" is a table (Etapa, Aceitável, Responde
pela etapa) with the same API. Built by Prensa.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-16 10:17:20 -03:00
Cauê Faleiros
ee772a43ff refactor: the production board and the order panel in files of their own
Plan 007e (Critical Corrections 7, last step; layout Phase D step 1):
web/kanban-board.js holds the board and the phone screens, and
web/kanban-order.js the order panel, its dialogs, the final files and
Abrir e conferir, moved verbatim from kanban.js (now 952 lines). The
browser test also walks the phone board. Built by Prensa.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-11-16 09:46:36 -03:00