Commit Graph

11 Commits

Author SHA1 Message Date
Cauê Faleiros
a712c69aca fix: align proof, treatment, metrics and site videos with PDF
All checks were successful
Build and deploy / Validate source (push) Successful in 11s
Build and deploy / Integration suite on a real stack (push) Successful in 5m44s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m22s
2026-11-06 15:27:48 -03:00
Cauê Faleiros
3d1293a3af test: a unique CNPJ in the search and the reset output (0.11) 2026-11-06 11:19:41 -03:00
Cauê Faleiros
0319039328 feat: every order is born with its origin, shown, filtered and counted (Dropstar's rules D-21 and D-35)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m21s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m1s
Orders carry site, dropflow or atendimento, required and with no default,
limited to the three. The Site's orders are marked site where they are
created; older orders became site. The Kanban shows the origin on each card
and in the order panel, filters by it, and Numeros has a Por origem table:
orders, metres, money and time from payment to Finalizado per way in.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 11:39:08 -03:00
Cauê Faleiros
494925dff4 feat: time in "Aguardando contato" no longer counts in Números (Dropstar's rule D-38)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m20s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m0s
Dropstar's internal rules (2026-10-26): waiting for a word with the customer
has no deadline and does not enter the time figures.

- each wait is kept, from the mark to "Contato feito" (and from checkout when
  the customer asks for a proof), in a new table; waits open today are
  recorded from their start
- the time in each stage and "Do pagamento ao Finalizado" leave those waits
  out, and the Números page says so

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 10:45:14 -03:00
Cauê Faleiros
b6f20733fa feat: Dropstar's new flow: Arte conferida is the queue, Revisão and the Revisor
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 3m36s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m24s
The board Dropstar drew on 2026-10-23: Arte recebida, Arte conferida,
Imprimindo, Correção, Revisão, Finalizado.

- Fila de impressão leaves the board: Arte conferida is the queue. It takes
  an order only with every item's final approved, keeps the finals as
  approved, orders its cards for printing and has the room's "Baixar" and
  the automatic folder. Orders that were in the queue move there once, with
  a line in their history
- Revisão checks the printed sheet, and the new Revisor profile is the only
  one that sends an order to Finalizado (the superadmin too, for support)
- who moves what, from the server (MOVES): the designer the artwork, asking
  for corrections and bringing the new art back; the operator Arte conferida
  to Imprimindo to Revisão; admin and gestão everything else, Correção
  included; a step back belongs to whoever makes the move it undoes
- Tiny: Arte conferida is "Preparando envio" and Finalizado "Pronto para
  envio", for delivery orders too
- Prova OK still comes before Finalizado; the customer's portal shows the
  new steps

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 12:45:57 -03:00
Cauê Faleiros
3ae453f47a fix: Números measures what Dropstar asked: machines by film printed, stages by order
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m23s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m7s
- a machine's metres are the film printed, not the metres billed, which round
  up to one metre and made small orders look like fast printing
- orders in Imprimindo together on one machine count that time once
- a stage's median time is per order, the sum of its passages, so rework
  reads as one slow order instead of quick passages

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 15:25:08 -03:00
Cauê Faleiros
d4494a0654 feat: Dropstar's corrections of 21/10 that need no answer from them
All checks were successful
Build and deploy / Validate source (push) Successful in 1m30s
Build and deploy / Integration suite on a real stack (push) Successful in 4m2s
Build and deploy / Secret scan and release gate (push) Successful in 14s
Build and deploy / Publish images (push) Successful in 1m48s
- the home example priced as the ready sheet it shows (nota 92, R$ 14,90)
- opening hours 7h to 18h, and art sent at any time
- uploads up to 1 GB, every file scanned
- a Designer profile: artwork and corrections on every order, moving only
  among Arte recebida, Arte conferida and Correção
- Números by date range, per machine, and orders apart from passages

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 10:09:15 -03:00
Cauê Faleiros
6919383d37 feat: "Fazer backup agora" in Integrações
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 4m40s
Build and deploy / Secret scan and release gate (push) Successful in 13s
Build and deploy / Publish images (push) Successful in 1m29s
The backup row gets a button that asks for a backup outside the daily hour,
for after a failure or before a risky change. The Kanban records the
request; the backup service, which alone may read the whole database, looks
every minute and runs it. The row says it was asked for until it runs.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 17:09:00 -03:00
Cauê Faleiros
b3c5f63553 feat: customers show by their company's name, taken from the CNPJ registry
The Site asks for e-mail, CNPJ and WhatsApp only, so the Kanban showed an
e-mail where a name belongs and a new Tiny contact was named after it. The
worker now looks up each customer's CNPJ in the public registry (BrasilAPI,
no key) a few at a time, never while a customer waits, and keeps the razão
social and trade name in dtf_local.cnpj_names; a failed lookup is retried a
day later. Cards, the order panel, quotes and the search results show the
trade name (else the razão social) above the e-mail, the search finds
orders and quotes by either name, and a new Tiny contact gets the razão
social as its name and the trade name as fantasia.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 12:19:35 -03:00
Cauê Faleiros
1b445f0459 feat: a Números tab with the production numbers the board already records
Every paid order and every move is recorded, but nobody could see the
totals. The new tab shows, for the last 7, 30 or 90 days: paid orders,
metres sold, money received, the average ticket, how many orders needed a
correction, and the median time from payment to Finalizado. A column per
day charts the metres sold (with a table under it), and a table gives each
stage's median time and what waits in it now, with the oldest order.
Test and cancelled orders stay out.

The header now has five tabs: the search box narrows first, the refresh
picker keeps its width, and the operator's e-mail moves to Sair's tooltip
on narrower screens.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 12:01:03 -03:00
Cauê Faleiros
352590e63a feat: Kanban shows each order's artwork, filters quotes and searches orders and quotes
All checks were successful
Build and deploy / Validate source (push) Successful in 1m25s
Build and deploy / Integration suite on a real stack (push) Successful in 3m16s
Build and deploy / Secret scan and release gate (push) Successful in 13s
Build and deploy / Publish images (push) Successful in 1m29s
The customer's browser sends the small picture it already makes of each file
(at most 300 KB, WebP/JPEG/PNG read from the bytes, own uploads only); it goes
when the file's bytes go. Board cards, quote rows, the order panel and the
quote detail show it, with the layout drawing as a second view and as the
fallback for files without a picture.

Cotações gets a customer filter (e-mail, CNPJ, WhatsApp) and product, layout
and resolution-warning chips, with the page bar always shown. The board adds
Entrega, Retirada and stalled-order chips. The top search now covers orders in
any stage and unpaid quotes; CNPJ and phone match by digits only when nothing
but digits and punctuation was typed.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 11:46:33 -03:00