Commit Graph

171 Commits

Author SHA1 Message Date
Cauê Faleiros
67fad3a2d7 fix: the profiles table says Financeiro only looks at Pagamentos
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 4m0s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m5s
Resolving a payment needs Gestão or Administrador (Dropstar, 2026-10-30:
Financeiro "vê Pagamentos"), and the table showed it as something Financeiro
does. It also lists registering an order paid outside the site, which
Administrador and Gestão do (D-35).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 10:37:35 -03:00
Cauê Faleiros
2615163fd3 feat: stroke class, residue per artwork, mixed strokes, sheets split by class
All checks were successful
Build and deploy / Validate source (push) Successful in 1m25s
Build and deploy / Integration suite on a real stack (push) Successful in 4m40s
Build and deploy / Secret scan and release gate (push) Successful in 12s
Build and deploy / Publish images (push) Successful in 1m38s
Round 3, items 9, 4, 16 and 17 (Dropstar, 2026-10-30).

- 9: the Site measures the thinnest stroke of each sheet and loose artwork
  (alpha > 40, chamfer distance in strips, width at local maxima, 1st
  percentile, at 300 DPI) and sends stroke_px and C1/C2/C3 with the item.
  The Kanban shows the class prefilled in the approve step; Produção may
  change it (POST /orders/{id}/contraction, who and when recorded), and the
  manifest carries it.
- 4: the residue check runs on each loose artwork, accepted per artwork; the
  sheet inherits what was accepted.
- 16: fine lines and solid areas in one file. Loose art: a pop-up with
  [Subir separado] [Continuar assim]. Ready sheet: protect the fine lines
  (default), protect the solid areas (stroke_choice client_c3, starts at C3)
  or go back and send two sheets, which holds the order.
- 17: loose art of fine (C1, C2) and solid (C3) strokes goes on separate
  sheets, each its own order item (split group/part/of) with its own file
  and class. Each sheet rounds to 10 cm and the 1 m minimum is charged once
  per group, since the customer did not choose the split. Cart, payment
  summary, portal, receipt and mail show it as such.
- The board loads quote views in two queries instead of two per quote.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 10:24:29 -03:00
Cauê Faleiros
388408d4d6 feat: drop a card on the machine it prints on; Pagamentos says who paid
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m38s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 57s
- Imprimindo: every active machine has its lane, and a card dragged
  from the queue onto a lane goes to that machine (if it prints the
  product and has a place), instead of the one it came with. The
  operator's pull still goes to the machine they are on (item 12).
- Pagamentos: each payment shows who tried to pay and what they were
  buying (the quote's customer and items, and its order if there is
  one); a click opens the customer's name, e-mail, CPF/CNPJ, WhatsApp
  and delivery, the quote, and Mercado Pago's id and status.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 17:23:35 -03:00
Cauê Faleiros
a010b2507e fix: a stalled card says it only in red at its time, not as a mark too
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m41s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m1s
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 17:03:23 -03:00
Cauê Faleiros
df601a7b6e fix: Números' rework meters are thin bars again
All checks were successful
Build and deploy / Integration suite on a real stack (push) Successful in 3m30s
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m11s
The panel filler and the meter's bar were both called .fill, so every bar
took the filler's 460 px; the filler is .fillbox now.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 16:53:25 -03:00
Cauê Faleiros
67a9cd9533 fix: the item preview's tab says Montagem, so it fits beside Arte
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m25s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 53s
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 16:17:35 -03:00
Cauê Faleiros
0b8eb143ad feat: the Kanban on the phone follows the phone mockup
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m40s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 56s
- Top bar with the logo, search and filters; at the bottom Produção,
  Cotações, Pagamentos, Números and "Mais" (Integrações, Usuários, the
  machine, the theme, the password, Sair) in a sheet.
- Produção: the stages as chips, the stage's metres and the session's
  machine over the cards, the queue's download as a button, the
  filters (product included) in a sheet.
- The order as a page: back, the order and its stage, the next step
  with its buttons at the bottom, the facts as rows, WhatsApp, Arquivos
  and Histórico; its actions in a sheet. A quote opens the same way.
- Pagamentos as cards, Números as the mockup's figures, chart and
  lists, Usuários as a list, Integrações as cards, the search as a page,
  dialogs as sheets, and the sign-in with the sheet rolling on top.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 15:00:08 -03:00
Cauê Faleiros
f5c8bcfb90 fix: Kanban panels keep their size; their lists scroll inside
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m35s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m1s
Creating users, machines or orders no longer changes the screen: Pessoas
and the Tiny log have a fixed height, Máquinas shows two and scrolls,
Pagamentos fills the window, Números' machines and treated art scroll in
their panels, and the board fills the window with each column scrolling
under its head. On the phone the pages scroll as before.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 14:42:18 -03:00
Cauê Faleiros
d2e340032e fix: the Kanban's login fits the window, the menus are the mockup's again
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m31s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m8s
- Sign-in: the page is the window's height, never scrolls; the sheet
  rolling under the marks is the design's (docs/design/folha-sapo-flor.svg).
- The account, refresh and order menus had lost their look with the old
  panel's rules; they are popovers again. The account menu leaves the
  theme to the rail's button, right above it.
- Números: panels of a row share their height; rework's lists by
  printer and waiting fold under a line.
- Cotações: the chips of the mockup (Têxtil, UV, Folha, Avulsa, Com
  ressalva), no field of its own; a customer from the top search shows
  as a tag that takes the filter off.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 14:25:53 -03:00
Cauê Faleiros
6f294e168b feat: the Kanban's new screens, from the board to the phone (redesign, steps 2 to 8)
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 4m37s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m10s
- Board: product switch and a filters panel with counts, cards that say
  the next step and the most urgent mark, Imprimindo in one lane per
  machine with its free places, Finalizado as short cards.
- Order panel: the stage and codes on top, "Próximo passo" with its
  button, Pedido / Arquivos / Histórico tabs; going back, contact,
  rework and cancelling in a menu; every form in a dialog.
- Cotações, Pagamentos, Integrações, Números (a calendar for the
  period) and Usuários (who is on the system now, what each profile
  does, the machines) in the design's panels; the sign-in page.
- Phone: sections at the bottom, one stage at a time, the order and
  the dialogs over the whole screen.
- API: each session records when it was last used (at most once a
  minute), for "Ativo agora"; the board says who is on each machine.
- .dockerignore leaves the local test files out of the build.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 13:58:05 -03:00
Cauê Faleiros
c76d2fa7f3 feat: the Kanban's frame, a rail of sections and a new top bar (redesign, step 1)
All checks were successful
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 54s
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m54s
The sections move from tabs in the top bar to a rail on the left, with
an icon each, the counters for Cotações, Pagamentos and Integrações, the
light/dark switch and the account button at the bottom. Its menu holds
"Trocar de máquina", the theme, "Minha senha" and "Sair". The machine of
the session shows in the rail and as a chip in the top bar, both opening
the machine question.

The top bar carries the page's name (Produção also says what is open:
"13 pedidos, 17,40 m em produção"), the search, Tiny only when it needs
attention, and "Atualizado às 09:18": a click there sets how often it
updates by itself, over the same remembered setting, or updates now.
The pages' own headings are gone; on narrow screens the rail lies along
the top until their own layout.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 09:19:45 -03:00
Cauê Faleiros
05139b71ff feat: the Kanban's new base, dark and light (redesign, step 0)
All checks were successful
Build and deploy / Validate source (push) Successful in 1m46s
Build and deploy / Integration suite on a real stack (push) Successful in 4m29s
Build and deploy / Secret scan and release gate (push) Successful in 9s
Build and deploy / Publish images (push) Successful in 1m25s
The design canvas's tokens replace the old palette, with a light theme
beside the dark one: the account menu switches them, and each browser
remembers its choice (web/theme.js, loaded in the head so the page never
flashes the other theme). Every hard-coded colour now goes through a
token, so the screens not redesigned yet read in both themes; their old
variable names map onto the tokens until each is rebuilt. Instrument
Sans and IBM Plex Mono replace Manrope, and the "filme descolando" logo
the D. The look before this is kept in git tag ui-v2.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-31 08:59:37 -03:00
Cauê Faleiros
db877c52e6 feat: the machine is chosen at sign-in, per session (Dropstar's third round, item 12)
Some checks failed
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Failing after 2m32s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Has been skipped
After signing in, the Kanban asks "Em qual máquina você está?": required
for the operator, optional for Gestão and Administrador ("Não estou em
máquina"), never for the other profiles. The session keeps it until it
ends or is changed from the header, where the machine shows in green;
one person on two computers runs two machines. Someone else already on
the machine is a warning, not a refusal.

Operators see the whole board (no more per-machine filter). From Arte
conferida they pull any card, which becomes their machine's (a machine
that does not print its product refuses it); they move only their
machine's cards, and the others show without drag or buttons. Their
cards and their machine's row in Imprimindo are outlined in green. The
history records the machine with the person: "Imprimindo · Thales ·
máquina2". Usuários shows who is on each machine now, read-only; the old
operator/machine assignment is no longer read.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 13:18:24 -03:00
Cauê Faleiros
8c053596b7 feat: the Financeiro profile (Dropstar, 2026-10-30)
All checks were successful
Build and deploy / Validate source (push) Successful in 14s
Build and deploy / Integration suite on a real stack (push) Successful in 4m44s
Build and deploy / Secret scan and release gate (push) Successful in 9s
Build and deploy / Publish images (push) Successful in 1m12s
Financeiro sees the whole board, Pagamentos, Números and Cotações, and
cancels an order with its reason. It moves no card and touches no file;
resolving a payment stays with Gestão and Administração. Two narrower
capabilities carry it: "payments" (the Pagamentos list) and "cancel",
which used to need "manage". The order panel's menu shows each profile
only what it may do.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 12:56:53 -03:00
Cauê Faleiros
6a312bec9c fix: the account button sits beside the refresh control, without a gap
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 3m57s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m13s
The panel menu's .morewrap rule (margin-left:auto), later in the file,
won over .account's, so the header's free space was split between the
search box and the account button. The account's rule is now specific
enough to win.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 11:33:54 -03:00
Cauê Faleiros
455c1a1fae feat: the order folders numbered in the flow's order, with Revisão and Imprimindo (Dropstar, 2026-10-30)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m50s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m1s
The automatic folders are now 1. Arte recebida, 2. Arte conferida,
3. Imprimindo, 4. Revisão, 5. Finalizado and Recibos, all created when
the main folder is chosen. The file goes to 4. Revisão with the card
(before, it stayed in Arte conferida) and then to 5. Finalizado; 3.
Imprimindo is for the machines' hot folders. Files in the old
3. Finalizado move to 5. Finalizado keeping their 30 days, and the old
folder goes once it is empty.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 10:21:02 -03:00
Cauê Faleiros
c08136d87b feat: the Imprimindo column shows each machine's two places, not a row of counters
All checks were successful
Build and deploy / Validate source (push) Successful in 1m28s
Build and deploy / Integration suite on a real stack (push) Successful in 4m20s
Build and deploy / Secret scan and release gate (push) Successful in 15s
Build and deploy / Publish images (push) Successful in 1m38s
Each machine with something printing is one line: its name, the order
printing (green, as the card's Imprimindo label) and the one ripping
(blue, as Ripando), each opening its order, or a dashed "livre" place;
above the limit, the extra order shows in red. The machines with nothing
printing share one line, "Livres: máquina3 · máquina4", so an empty
column takes one line instead of a grid of "0/2" chips. In a narrow
column the places go under the machine's name.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 10:08:59 -03:00
Cauê Faleiros
d962865944 feat: the pickup receipt in Recibos/ and "Retirado" on the card (Dropstar's third round, item 14)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m38s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 59s
A pickup order reaching Finalizado has its receipt due: a PDF for the
80 mm roll with the order number large at the top, the customer and
CPF/CNPJ, each product and its metres, the amount and how it was paid,
the date issued, and the "Retirado em" and "Assinatura" lines
(app/receipt.py). The Kanban's folder saves it in Recibos/, where the
counter's print queue sends it to the Bematech. One computer claims each
receipt on the server before writing it, so it is never printed twice,
and gives it back if it could not save it. Orders sent by carrier have
none.

"Retirado" on a pickup in Finalizado records when and who handed it
over, with an optional photo of the signed receipt (kept 30 days). Anyone
but the seller may mark it (new "deliver" capability); the order panel
also opens the receipt to print it again.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 18:39:17 -03:00
Cauê Faleiros
a5417d200e feat: a real progress bar per file while it uploads (Dropstar's third round, item 6)
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m42s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 56s
A file starts uploading as soon as it is on the product page, not once
the item is in the cart. Under the uploader, each file has its row:
"Enviando NOME · 62% · 1,2 MB de 2,0 MB", then the security check, then
"enviado"; a failure says why, with "Tentar de novo". Each part goes
through XMLHttpRequest, so the bytes move while a part is on its way
instead of once per 8 MB part. A file taken off the page, and in no cart
item, stops uploading.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 18:18:56 -03:00
Cauê Faleiros
95e7c64501 feat: "Tratar a arte" on an order in Arte recebida (Dropstar's third round, item 8)
All checks were successful
Build and deploy / Integration suite on a real stack (push) Successful in 3m36s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 59s
Build and deploy / Validate source (push) Successful in 5s
The order panel shows where each item's file is in the orders folder,
with Copiar: 1. Arte recebida\DTF-N-item-K, named as the automatic
folders save it (GET /api/operator/orders/{id}/folder-files). The browser
knows only the folder's name, so each computer is told once where it is
and the whole path is copied. "Subir arte tratada" sends the file saved
over; it becomes the item's final, "Arte tratada" lights and the order
can move to Arte conferida.

Only the treated item changes: the others keep their approved final,
which the server now accepts beside a new one (still refused when
nothing is new).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 17:24:15 -03:00
Cauê Faleiros
7f2327aea9 feat: the customer may accept printing a ready sheet's residue dots (Dropstar's third round, item 5)
All checks were successful
Build and deploy / Validate source (push) Successful in 8s
Build and deploy / Integration suite on a real stack (push) Successful in 3m53s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m8s
A sheet with dots under 2 mm still stops the order, now with a box under
the warning: "Esta arte tem N pontos menores que 2 mm. Estou ciente e
aceito imprimir assim — eles podem se perder no recorte." Ticked, the
sheet goes on, and the item carries how many dots were accepted
(residue_accepted), kept through the review and shown on the Kanban card,
order panel and quote. A solid background still stops it, with no box.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 17:10:28 -03:00
Cauê Faleiros
9c44cdf2a1 feat: two cards at most in Imprimindo per machine, one printing and one ripping (Dropstar's third round, item 11)
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 4m14s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m5s
A third pull onto the same machine is refused with "máquina5 já tem 2 em
Imprimindo", and so is changing a printing order to a full machine. On
the board, the first order to enter Imprimindo on its machine is labelled
Imprimindo and the next Ripando; the column shows each machine's count,
as "máquina5 · 2/2".

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 16:19:04 -03:00
Cauê Faleiros
35b7701664 feat: the Site's product cards and uploader as Dropstar's third round asks (items 1 to 4)
Some checks failed
Build and deploy / Validate source (push) Successful in 1m27s
Build and deploy / Integration suite on a real stack (push) Successful in 4m14s
Build and deploy / Secret scan and release gate (push) Successful in 9s
Build and deploy / Publish images (push) Failing after 1m14s
- the "Mais vendido" card has a thick green border
- the four "Enviar..." buttons share that green as the action colour
- the uploader sits on top of the file list, the newest file right under it
- with files in, the uploader stays big and highlighted instead of shrinking
  to a thin dashed line

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-29 14:46:29 -03:00
Cauê Faleiros
636c27ee88 feat: the customer's proof only on orders above 10 m (Dropstar, 2026-10-28)
All checks were successful
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m13s
Build and deploy / Validate source (push) Successful in 10s
Build and deploy / Integration suite on a real stack (push) Successful in 4m6s
The checkout's "Quero aprovar uma prova" box shows only when the cart is
above 10 m, and the server keeps the request only then. Below 10 m there is
no proof; above it the room's own proof stays automatic.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-28 14:12:59 -03:00
Cauê Faleiros
ebe8b29db2 feat: UV is 27 cm wide (Dropstar, 2026-10-28)
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m27s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m0s
It was 28,5 cm. The Site's UV products, ready-sheet check, layout and size
shortcuts, the server's film-width check, the print file and the Tiny item
names follow; two pieces of up to 13,2 cm share a UV row.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-28 11:08:07 -03:00
Cauê Faleiros
b08a258931 feat: the Administrador may release orders to Finalizado too
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m34s
Build and deploy / Secret scan and release gate (push) Successful in 4s
Build and deploy / Publish images (push) Successful in 1m1s
D-29 keeps the release with the Revisor, so nobody in the room releases
their own print; the Administrador, Dropstar's own login, may release as
well (the user, 2026-10-28). Gestao, Designer and Operador still cannot.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-28 10:34:24 -03:00
Cauê Faleiros
ee6344dc74 feat: files up to 4 GB again (Dropstar, 2026-10-28)
All checks were successful
Build and deploy / Validate source (push) Successful in 1m5s
Build and deploy / Integration suite on a real stack (push) Successful in 5m22s
Build and deploy / Secret scan and release gate (push) Successful in 9s
Build and deploy / Publish images (push) Successful in 1m24s
It was 5 GB, then 1 GB from 2026-10-21. ClamAV keeps scanning up to its own
2000 MiB limit; a larger file passes by the file-format check, as before
the 1 GB limit.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-28 09:58:42 -03:00
Cauê Faleiros
5692804c6f feat: rework register, opened by Gestao with a locked cause and authorized by an Administrador (Dropstar's rules D-02 to D-04)
All checks were successful
Build and deploy / Validate source (push) Successful in 10s
Build and deploy / Integration suite on a real stack (push) Successful in 3m27s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m2s
Gestao opens a rework from the order panel with its cause (falha de
impressao, perfil de cor, erro de tratamento, erro de pedido, or arte
aprovada pelo cliente, outside the goal), the metres redone and a note; the
cause never changes. An Administrador authorizes or declines it with a
reason, never one they opened, and only an authorized rework counts. The
order keeps who printed it. Numeros shows the metres redone per cause over
the film printed, against 0,4% per cause and 1,6% for the house, by who
printed, and the reworks waiting for authorization. Vendedor goes back to
viewing only (D-30): registering orders paid outside is Administrador and
Gestao.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 13:09:56 -03:00
Cauê Faleiros
c45e5f732b feat: the team registers an order paid outside the site, choosing its origin and payment (Dropstar's rule D-35)
Some checks failed
Build and deploy / Integration suite on a real stack (push) Failing after 3m26s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Has been skipped
Build and deploy / Validate source (push) Successful in 6s
On an approved quote in Cotacoes, Administrador, Gestao and Vendedor pick
the origin (Site, Dropflow, Atendimento) and how it was paid (Pix, cartao,
dinheiro, credito do cliente), neither preselected, with an optional note.
The price is the quote's, the Site's table price. The order is marked paid
outside, counts in Numeros, and goes to Tiny like a Site order with the
payment named in its internal note; a Dropflow order stays out of Tiny,
status updates and cancelling included, until its revenue category exists.
Auto-refresh waits while a register form on screen is half filled in.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 12:36:40 -03:00
Cauê Faleiros
0319039328 feat: every order is born with its origin, shown, filtered and counted (Dropstar's rules D-21 and D-35)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m21s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m1s
Orders carry site, dropflow or atendimento, required and with no default,
limited to the three. The Site's orders are marked site where they are
created; older orders became site. The Kanban shows the origin on each card
and in the order panel, filters by it, and Numeros has a Por origem table:
orders, metres, money and time from payment to Finalizado per way in.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 11:39:08 -03:00
Cauê Faleiros
bba55a83f3 feat: a file's type comes from its first bytes, not its name (Dropstar's rule D-13)
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 3m37s
Build and deploy / Secret scan and release gate (push) Successful in 7s
Build and deploy / Publish images (push) Successful in 1m11s
The Site reads the first bytes when a file is chosen and renames it to its
real extension: a .cdr that is a PDF is measured and priced as a PDF,
without the manual charge; a JPG called .png is refused, naming the file.
The scan does the same on the server and stores the real name, so every
decision that reads the name follows the content. A name its content agrees
with stays (an .ai is a PDF inside but is still handled by hand).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 11:17:20 -03:00
Cauê Faleiros
494925dff4 feat: time in "Aguardando contato" no longer counts in Números (Dropstar's rule D-38)
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m20s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m0s
Dropstar's internal rules (2026-10-26): waiting for a word with the customer
has no deadline and does not enter the time figures.

- each wait is kept, from the mark to "Contato feito" (and from checkout when
  the customer asks for a proof), in a new table; waits open today are
  recorded from their start
- the time in each stage and "Do pagamento ao Finalizado" leave those waits
  out, and the Números page says so

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 10:45:14 -03:00
Cauê Faleiros
6a921415ea feat: the folders catch up on what passed while the Kanban computer was off
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m27s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 56s
Dropstar's internal rules (2026-10-26): the folder must reproduce what passed,
not only what sits in the columns when the computer comes back, or a room
running 24 hours leaves a gap a week in the Finalizado archive.

- the Kanban remembers when the folders were chosen and asks for every order
  paid since then, whatever its stage; each file goes to its stage's folder,
  so an order finished while the computer was off lands in 3. Finalizado
- orders paid before the folders were chosen still stay out, so setting them
  up never pulls old orders back into the queue
- the server's file list for the folders and Baixar now loads only the orders
  that have a file, not every order in the stages

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 10:15:16 -03:00
Cauê Faleiros
35e64d77d7 feat: "Arte tratada" flags the orders whose final the team prepared, counted in Números
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m20s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 58s
Dropstar's internal rules (2026-10-26) asked how to tell art that arrived
ready from art the designer had to fix, and Marcus agreed on 2026-10-27 to
mark it automatically, for the designer's productivity.

- an order whose approved final is not the customer's art (not the file the
  system generated from it, not one of their originals, not a correction
  they sent) shows "Arte tratada" on its card and in the order, with who
  approved it
- Números counts the period's treated orders, the share of all orders, and
  how many each person approved
- the Kanban's cancel text: the money stays as the customer's credit, in
  Dropstar's financial control (rule D-15), no longer a refund
- Números' machine table shows the orders waiting in Arte conferida again;
  it still looked for the old print queue

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 10:01:35 -03:00
Cauê Faleiros
f77de40b7f feat: Gestão only pulls cards back, with a reason (Dropstar's rule D-20)
All checks were successful
Build and deploy / Validate source (push) Successful in 10s
Build and deploy / Integration suite on a real stack (push) Successful in 4m5s
Build and deploy / Secret scan and release gate (push) Successful in 10s
Build and deploy / Publish images (push) Successful in 1m33s
Dropstar's internal rules of 2026-10-26: the coordination pulls back, never
forward, always with a reason. The Gestão profile now sends orders to
Correção from any stage and steps them back, and no longer moves them
forward. Admin, Dropstar's own login, keeps every move but Finalizado, which
stays the Revisor's (D-29).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-27 09:16:00 -03:00
Cauê Faleiros
0088158dc0 feat: the three folders are created when the main one is chosen, numbered in the flow's order
All checks were successful
Build and deploy / Validate source (push) Successful in 7s
Build and deploy / Integration suite on a real stack (push) Successful in 3m31s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Successful in 1m4s
Tried on a local Kanban with Dropstar's flow: the folders appeared only with
the first file, and a listing showed Arte conferida before Arte recebida.

- "1. Arte recebida", "2. Arte conferida" and "3. Finalizado" are created
  as soon as the main folder is chosen or released, and again on every
  round if someone deletes one
- numbered, a folder listing shows them in the order the file moves

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 17:25:01 -03:00
Cauê Faleiros
ee1159065a feat: the orders' files in Dropstar's three folders: Arte recebida, Arte conferida, Finalizado
All checks were successful
Build and deploy / Validate source (push) Successful in 11s
Build and deploy / Integration suite on a real stack (push) Successful in 4m27s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m19s
Asked by Dropstar on 2026-10-23 and agreed on 2026-10-26. The automatic
folder becomes "Pastas dos pedidos": one main folder is chosen once, in
Chrome or Edge on a factory computer that reaches the server, and the
Kanban keeps three folders inside it, moved with the card.

- Arte recebida: the order's file as soon as the order arrives
- Arte conferida: the queue; the file moves there with the card and stays
  while it prints and is checked in Revisão
- Finalizado: when the order is released, kept 30 days
- Correção, a cancellation or a deletion takes the file out; a replaced
  final is swapped
- orders already printing when the folder is chosen are not downloaded; a
  file someone took out comes back only when its order moves on, so the
  server now returns the files of orders the folders hold while they print,
  are checked and finish
- Firefox, which cannot write into folders, still only downloads the files
  entering Arte conferida

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 16:31:20 -03:00
Cauê Faleiros
b6f20733fa feat: Dropstar's new flow: Arte conferida is the queue, Revisão and the Revisor
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 3m36s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m24s
The board Dropstar drew on 2026-10-23: Arte recebida, Arte conferida,
Imprimindo, Correção, Revisão, Finalizado.

- Fila de impressão leaves the board: Arte conferida is the queue. It takes
  an order only with every item's final approved, keeps the finals as
  approved, orders its cards for printing and has the room's "Baixar" and
  the automatic folder. Orders that were in the queue move there once, with
  a line in their history
- Revisão checks the printed sheet, and the new Revisor profile is the only
  one that sends an order to Finalizado (the superadmin too, for support)
- who moves what, from the server (MOVES): the designer the artwork, asking
  for corrections and bringing the new art back; the operator Arte conferida
  to Imprimindo to Revisão; admin and gestão everything else, Correção
  included; a step back belongs to whoever makes the move it undoes
- Tiny: Arte conferida is "Preparando envio" and Finalizado "Pronto para
  envio", for delivery orders too
- Prova OK still comes before Finalizado; the customer's portal shows the
  new steps

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 12:45:57 -03:00
Cauê Faleiros
88819c3a5f feat: one price per product; the grade is shown but no longer prices
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m58s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m11s
Dropstar asked on 2026-10-23 to drop the five-band ladder by grade:
textile R$ 19,90 a ready sheet and R$ 21,90 loose art, UV R$ 79,90 and
R$ 89,90.

- the server charges PRICES (app/core/pricing.py) whatever the grade; the
  grade is still validated and kept with the item, and discount_cents is gone
- a file opened by hand pays the product's price plus MANUAL_FILE_EXTRA_CENTS
- the Site's PRECO replaces FAIXAS, TABELA and MONTAGEM; the top chip, the
  home example, the product cards, the selector and the price table read it
  (data-preco), so no page still says "a partir de R$ 14,90"
- no "Desconto pela nota", ladder, "cai até" or "sai mais barato" anywhere;
  the buy box shows "Nota da arte" on its own line, the 96 DPI refusal and the
  resolution warning stay
- the review reason "Nota informada sem análise da arte" is removed: it only
  stopped a discount. The server still checks the grade against the files,
  so the grade shown on the Kanban and in Tiny stays honest
- the Tiny probe's test order uses the single price
- docs/CONTEXT.md: Commercial rules and Still to do

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 11:07:00 -03:00
Cauê Faleiros
a9253d830a feat: Dropstar's answers of 23/10 that need nothing more from them
All checks were successful
Build and deploy / Validate source (push) Successful in 1m6s
Build and deploy / Integration suite on a real stack (push) Successful in 4m5s
Build and deploy / Secret scan and release gate (push) Successful in 9s
Build and deploy / Publish images (push) Successful in 2m6s
- JPG is refused in every product, at upload and by the server: it has no
  transparency, so the background prints and loose art packs as a box
- a PDF over 150 MB says before payment that the Site cannot check it, as a
  file opened by hand does
- every piece that is not square is tried both ways; the 1 cm rule left
  19,5 x 18,5 cm standing, 2 to a row instead of 3
- a mirrored order (UV only) is flagged on its card and panel, and its print
  file's footer ends in ESPELHADO, in bold
- print files are named DTF-23-item-1, and the order panel copies DTF-23-,
  so the code pasted into the folder's search finds them
- the proof: up to 30 cm, from the thinnest lines, a piece of each different
  artwork, at most three per order, free
- a file opened by hand costs R$ 2,00 more a metre by default, and the Site
  says so

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-26 09:33:22 -03:00
Cauê Faleiros
56e5462647 perf: a ready sheet is decoded once for its check, with the progress shown
All checks were successful
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Successful in 3m23s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m8s
Drawn from the <img>, a large sheet was decoded again for each strip the
residue check reads. Decoded once into an ImageBitmap and reused for the
thumbnails, the check of a 57 x 50 cm sheet at 300 DPI drops from 4,7 s to
1,4 s, and the bar moves while it runs.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 18:06:03 -03:00
Cauê Faleiros
1dc8cf1efb feat: the print proof: Prova OK before Finalizado, and a proof the customer can ask for
Some checks failed
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Failing after 56s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Has been skipped
Dropstar's items 15 and 16 (2026-10-21).

- an order above 10 m prints 20 cm of proof first; the room checks it and
  marks "Prova OK", without stopping the order, and without that mark the
  order cannot reach Finalizado
- at checkout, "Quero aprovar uma prova antes de imprimir", for any length:
  the paid order arrives marked "Aguardando contato" with what to do, and
  waits for the customer's word on the photo sent by WhatsApp
- the card shows Prova / Prova OK, the panel gives the next step, and
  "Prova a conferir" is a board filter; the designer cannot mark it
- the proof is not billed, as Dropstar leans; rounds and which part of the
  sheet wait for their answer

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 17:21:26 -03:00
Cauê Faleiros
f6bdbe006e fix: checkout and the Kanban take layout version 3
All checks were successful
Build and deploy / Validate source (push) Successful in 4s
Build and deploy / Integration suite on a real stack (push) Successful in 3m9s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m20s
The layout rule of 2026-10-21 records version 3, but checkout still
refused any item not on version 2, so no order could be quoted (CI's
browser test timed out at the upload), and the Kanban marked new quotes
"Montagem antiga". Both now take versions 2 and 3, as the server does.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 17:05:35 -03:00
Cauê Faleiros
c8c49ed57e feat: the DTF's own terms at /termos, linked as "Trocas e privacidade"
Some checks failed
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Failing after 4m3s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Has been skipped
Dropstar's item 12 (2026-10-21): the footer link opened the clothing
store's terms. The DTF's page says what Dropstar listed: the art is
printed as sent and is the customer's responsibility, files are kept for
30 days, and a personalised product has no exchange for regret; and what
the customer's data is used for and where it goes. Waiting for Dropstar's
approval of the text.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 16:56:53 -03:00
Cauê Faleiros
e3c31e43e5 feat: residue and a solid background stop a ready sheet before payment
Some checks failed
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Failing after 4m10s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Has been skipped
Dropstar's items 2 and 3 (2026-10-21): both were warnings the customer
could pay past; now one dot is enough to stop the order.

- every pixel is read (images in strips at 1:1, large PNGs while they
  stream, PDFs rendered in strips at about 0,2 mm): the old check shrank
  the image first and could miss a small dot, or sampled every n-th pixel
- a residue is ink under 2 mm on both sides, measured from where the ink
  starts and ends in each cell: the same dot gets the same verdict wherever
  it falls on the grid, from 0,5 to 4 mm (his acceptance test)
- a solid background is under 1,5 % of transparent pixels; a JPG sheet
  always has one
- the sheet says how many dots there are, circles them on the preview, and
  asks to erase them and send again; the order waits for the check to end
- the page no longer offers JPG for a ready sheet

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 16:37:46 -03:00
Cauê Faleiros
fe7bf4ef07 fix: textile artwork can no longer be mirrored
Some checks failed
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Failing after 4m26s
Build and deploy / Publish images (push) Has been skipped
A textile transfer is pressed face down, so a mirrored one prints
backwards on the garment (Dropstar, 2026-10-21). The Site no longer offers
"Espelhar" on textile artwork and the server refuses a mirrored textile
layout. UV keeps the button until Dropstar decides.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 16:23:41 -03:00
Cauê Faleiros
9849ae5c14 fix: the layout lines up its columns and keeps 5 mm margins (layout version 3)
Some checks failed
Build and deploy / Validate source (push) Successful in 5s
Build and deploy / Integration suite on a real stack (push) Failing after 3m59s
Build and deploy / Secret scan and release gate (push) Successful in 6s
Build and deploy / Publish images (push) Has been skipped
Dropstar's item 5 (2026-10-21). The engine placed pieces on a 5 mm grid,
rounding each up: two 28,2 cm pieces needed 57,5 cm on a 57 cm film, so the
second column slid 8 cm down, rows ended 8,6 mm apart and nothing was left
at the edges. Order 1 came out 97,14 cm long.

- pieces are laid out in rows with their exact sizes: 5 mm at the top, the
  bottom and between rows; across the width 5 mm at the edges and between
  pieces, or, when that does not fit, the space left shared out equally,
  never under 1,5 mm (order 1: 2 mm each, 89,42 cm long)
- each artwork stands or lies down, whichever gives the shorter sheet
- the shape packing (pieces fitting into each other) is kept only when it
  saves at least 1 cm; otherwise the columns stay aligned
- the order records layout version 3; quotes made with version 2 still pass
- the preview says the spacing really used

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 16:17:21 -03:00
Cauê Faleiros
fc3c08aced feat: the board's filters in one panel: product, machine, delivery and situation, combined
All checks were successful
Build and deploy / Validate source (push) Successful in 8s
Build and deploy / Integration suite on a real stack (push) Successful in 3m20s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m8s
The row of fifteen chips, one filter at a time, becomes a Filtros button
with four lists. The choices combine (Têxtil on máquina2, waiting for
contact), each option says how many orders it would show, and the
filters in use stay beside the button as tags taken off with a click.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 15:39:59 -03:00
Cauê Faleiros
3ae453f47a fix: Números measures what Dropstar asked: machines by film printed, stages by order
All checks were successful
Build and deploy / Validate source (push) Successful in 6s
Build and deploy / Integration suite on a real stack (push) Successful in 3m23s
Build and deploy / Secret scan and release gate (push) Successful in 5s
Build and deploy / Publish images (push) Successful in 1m7s
- a machine's metres are the film printed, not the metres billed, which round
  up to one metre and made small orders look like fast printing
- orders in Imprimindo together on one machine count that time once
- a stage's median time is per order, the sum of its passages, so rework
  reads as one slow order instead of quick passages

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 15:25:08 -03:00
Cauê Faleiros
80975b9424 fix: the home example keeps its 0,60 m; only the price was asked to change
All checks were successful
Build and deploy / Validate source (push) Successful in 9s
Build and deploy / Integration suite on a real stack (push) Successful in 4m8s
Build and deploy / Secret scan and release gate (push) Successful in 8s
Build and deploy / Publish images (push) Successful in 1m9s
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 14:41:37 -03:00