The server compared the raw lowest resolution (95,6) with 96 but printed
it rounded, refusing '96 DPI abaixo do mínimo de 96'; it now decides on the
same rounded value the Site shows. A big cart started every upload at once
and hit the limit of 10 pending uploads (429): the limit is 30, that
refusal carries Retry-After so the Site retries by itself, and the Site
runs at most 4 uploads at a time.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
B1: an upload start was limited to 60 per 15 minutes per session, so a
66-file cart failed with 'Muitas tentativas'; now 1000 per session and
3000 per source, and the Site waits Retry-After and retries quietly.
B2: a failed file shows its error and 'Tentar de novo' on its own card, and
payment stays blocked with 'Falta enviar N arquivos'. B3: after signing in
again, an upload id the new session does not own (403) is dropped and the
file starts again. B4: the quote is never created before every file is
sent, and an untranslatable 422 is logged for Sentry.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Every order now carries a short report of the decisions that happened:
original format, conversion, resolution, background, residue, montage,
billed length, contraction, thin-stroke warning, parts and generation time.
The card shows it above the file; the payment summary shows the customer's
version. The upload keeps the original name so a renamed CDR/PDF is told.
A refused card showed Mercado Pago's code ("Pagamento recusado pelo Mercado
Pago (cc_rejected_insufficient_amount)"), a request it refused showed its
cause list, and some errors were in English ("Quote is already paid",
"Payment provider unavailable; try again"). Each now becomes one sentence:
"O cartão não tem limite suficiente para este valor. Use outro cartão ou
pague com PIX." The codes still go to the log and, on the Kanban's "Cartão
recusado" badge, beside the same sentence. A form check the customer cannot
read is replaced by a general one, and every error a customer or operator
can meet in the quote, upload, account and artwork routes is in Portuguese.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The customer's browser sends the small picture it already makes of each file
(at most 300 KB, WebP/JPEG/PNG read from the bytes, own uploads only); it goes
when the file's bytes go. Board cards, quote rows, the order panel and the
quote detail show it, with the layout drawing as a second view and as the
fallback for files without a picture.
Cotações gets a customer filter (e-mail, CNPJ, WhatsApp) and product, layout
and resolution-warning chips, with the page bar always shown. The board adds
Entrega, Retirada and stalled-order chips. The top search now covers orders in
any stage and unpaid quotes; CNPJ and phone match by digits only when nothing
but digits and punctuation was typed.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Files are uploaded before payment so the price and the security check use
the file itself, but an abandoned cart kept them for 30 days. Now a finished
upload is held 2 days, a quote waiting for review 7, an approved quote 2 more
to be paid, and the paid order keeps its originals for 30 days from upload.
A payment never starts for files that are gone; one under way holds them a
day. Files attached to an order take the order's window.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Sheets of several GB are the normal order. The upload limit is now 5 GB.
ClamAV scans files up to 2 GB; a larger file is released only when its
first bytes match the format its name claims, and a disguised file is
refused. The Site grades a sheet over 150 MB from the pixel size in its
PNG, JPEG or WebP header without decoding it, and reads large PDFs in
ranges. The worker never opens a source over 300 MB: a finished sheet
placed whole becomes its own print file, which the Kanban offers to approve
as the final, and anything else goes to hand preparation. Files start
uploading as they enter the cart, with progress in the summary, and each
part renews the reservation so slow uploads do not expire. Quotas grow to
50 GB per customer and 500 GB in total; the Swarm config for ClamAV is
renamed because a deployed config cannot change in place.
Verified locally with a 386 MB and a 1.8 GB PNG (scanned, paid, original
as print file), a 2.3 GB PNG (format check) and a disguised 2.3 GB file
(refused).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Kanban: tabs for production, quote review and payments/integrations; compact
cards with products, metres, print-file status, delivery and time in stage;
an order panel with stage progress, one main action, a correction reason in
place, items with a preview drawn from the approved layout, final-file
approval and the history as a timeline. Quote review gets a list and a pane;
payment issues resolve in place; integrations show their real state, Tiny's
connection with a read-only "Testar conexão", and a readable send log. The
previous Kanban is kept in git tag ui-v1 and is no longer served.
Production wording: the customer portal no longer says it is a local test
environment outside the local stack; the checkout no longer tells customers
to use the Kanban or shows internal stage codes; sign-in, session, quota and
print-file messages are Portuguese and never say "local". A simulated freight
price is refused outside the local stack until a real freight provider
exists, so production only offers pickup.
The browser suite drives the new tabs and panel and still checks the whole
upload, quote, payment and production journey. Full CI sequence passes locally.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
local/ held six unrelated things under a name that stopped being true once it
became the production runtime: the service, the frontend, the tests, the ops
commands, the container definitions and the dependency lock, 65 files with
nothing to tell them apart.
app/ the service: api/ routers, core/ for identity, database, models,
prices and secret loading, and the worker, bootstrap and schema
tests/ the twelve suites, no longer inside the shipped package
ops/ backup, readiness, dependency audit, security summary
infra/ Dockerfiles, gateway templates, ClamAV and storage configuration,
the requirements and their hash lock
web/ the Site, Kanban and portal pages with their scripts
deploy/Dockerfile.api now copies app/ alone, so the tests stop shipping to
production; the local image still carries them, because the suites run inside
the stack's network.
Five kinds of reference had to follow, and each was found by something different
rather than by reading. Imports of the form "from . import db" survived a rewrite
that only matched "from .db import". Tests kept relative imports of modules that
had left the package. A mock.patch target names its module in a string, where no
import rewriting can see it. The browser test resolves a fixture by path. And the
release gate's markers pointed at local/runtime.py and local/worker.py, which is
the decay its new marker test exists to catch — it caught it.
Verified from docker compose down -v: the stack starts, all six integration
suites, both browser suites and the twenty-nine unit tests pass.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>