Files are uploaded before payment so the price and the security check use
the file itself, but an abandoned cart kept them for 30 days. Now a finished
upload is held 2 days, a quote waiting for review 7, an approved quote 2 more
to be paid, and the paid order keeps its originals for 30 days from upload.
A payment never starts for files that are gone; one under way holds them a
day. Files attached to an order take the order's window.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Sheets of several GB are the normal order. The upload limit is now 5 GB.
ClamAV scans files up to 2 GB; a larger file is released only when its
first bytes match the format its name claims, and a disguised file is
refused. The Site grades a sheet over 150 MB from the pixel size in its
PNG, JPEG or WebP header without decoding it, and reads large PDFs in
ranges. The worker never opens a source over 300 MB: a finished sheet
placed whole becomes its own print file, which the Kanban offers to approve
as the final, and anything else goes to hand preparation. Files start
uploading as they enter the cart, with progress in the summary, and each
part renews the reservation so slow uploads do not expire. Quotas grow to
50 GB per customer and 500 GB in total; the Swarm config for ClamAV is
renamed because a deployed config cannot change in place.
Verified locally with a 386 MB and a 1.8 GB PNG (scanned, paid, original
as print file), a 2.3 GB PNG (format check) and a disguised 2.3 GB file
(refused).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Kanban: tabs for production, quote review and payments/integrations; compact
cards with products, metres, print-file status, delivery and time in stage;
an order panel with stage progress, one main action, a correction reason in
place, items with a preview drawn from the approved layout, final-file
approval and the history as a timeline. Quote review gets a list and a pane;
payment issues resolve in place; integrations show their real state, Tiny's
connection with a read-only "Testar conexão", and a readable send log. The
previous Kanban is kept in git tag ui-v1 and is no longer served.
Production wording: the customer portal no longer says it is a local test
environment outside the local stack; the checkout no longer tells customers
to use the Kanban or shows internal stage codes; sign-in, session, quota and
print-file messages are Portuguese and never say "local". A simulated freight
price is refused outside the local stack until a real freight provider
exists, so production only offers pickup.
The browser suite drives the new tabs and panel and still checks the whole
upload, quote, payment and production journey. Full CI sequence passes locally.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
local/ held six unrelated things under a name that stopped being true once it
became the production runtime: the service, the frontend, the tests, the ops
commands, the container definitions and the dependency lock, 65 files with
nothing to tell them apart.
app/ the service: api/ routers, core/ for identity, database, models,
prices and secret loading, and the worker, bootstrap and schema
tests/ the twelve suites, no longer inside the shipped package
ops/ backup, readiness, dependency audit, security summary
infra/ Dockerfiles, gateway templates, ClamAV and storage configuration,
the requirements and their hash lock
web/ the Site, Kanban and portal pages with their scripts
deploy/Dockerfile.api now copies app/ alone, so the tests stop shipping to
production; the local image still carries them, because the suites run inside
the stack's network.
Five kinds of reference had to follow, and each was found by something different
rather than by reading. Imports of the form "from . import db" survived a rewrite
that only matched "from .db import". Tests kept relative imports of modules that
had left the package. A mock.patch target names its module in a string, where no
import rewriting can see it. The browser test resolves a fixture by path. And the
release gate's markers pointed at local/runtime.py and local/worker.py, which is
the decay its new marker test exists to catch — it caught it.
Verified from docker compose down -v: the stack starts, all six integration
suites, both browser suites and the twenty-nine unit tests pass.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>